Similar Projects
All One One All - A D'Artagnan Farm
Renovation, Infrastructure
Conception
$400,000 CJ est. value
Goshen, NY 10924

River Road Rehabilitation -3269- Rockland County
Infrastructure
Conception
$11,700,000 est. value
Stony Point, NY 10980

Brookview Village - Expansion Phase III
Infrastructure
Design
$500,000 to $1,000,000 est. value
Greenfield Center, NY 12833

US Route 11 over Tioughnioga River Bridge Project
Demolition, New Construction, Infrastructure
Design
$20,500,000 CJ est. value
Tully, NY 13159

RFP D/B - Design - Build Services for Communication Based Train Control
Infrastructure
Bidding
$100,000,000 CJ est. value
New York, NY 10007

Pedestrian Improvements
Infrastructure
Bidding
$520,000 CJ est. value
Pine Bush, NY 12566

Pennrose Taylor Apartments Phase One
New Construction, Infrastructure - 150,000 SF
Post-Bid
$41,000,000 CJ est. value
Troy, NY 12180

Frontage Neighborhood Water Main Replacement
Infrastructure
Post-Bid
Elmsford, NY 10523

Cement Lined Ductile Iron Pipe
Term Contract
Results
Syracuse, NY

Fencing and Other Site Improvements at Hilltop Hanover Farm
Infrastructure, Alteration
Results
$200,000 to $250,000 est. value
Yorktown Heights, NY 10598

Fulton Street Mixed Use
New Construction, Infrastructure - 130,000 SF
Construction
$50,000,000 CJ est. value
New York, NY 11238

Beaver Dam Road Stormwater Management
Infrastructure
Construction
$419,878 CJ est. value
Brookhaven, NY 11752

South Pearl Street Group Living Shelter Addition
Addition, Demolition, Infrastructure - 30,972 SF
Pending Verification
$5,000,000 CJ est. value
Albany, NY 12202

7-Eleven - Flanders Road Gas Station Redevelopment / Riverhead
Demolition, New Construction, Infrastructure - 3,024 SF
Pending Verification
$800,000 CJ est. value
Riverhead, NY 11901

Polyset Expansion
Addition, Infrastructure - 24,500 SF
Conception
$1,250,000 CJ est. value
Mechanicville, NY 12118

Last Updated 10/21/2022 06:36 AM
Project Title

Storm Sewer Outfall Bypass - 901 Rail Drive

Physical Address View project details and contacts
City, State (County) Watertown, NY 13601   (Jefferson County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of constructing storm sewer outfall bypasses thru the project site for the northern and southern storm sewer outfalls. The storm sewer outfall bypass project passes thru an active Renzi Foodservice construction site. It is the contractors responsible to coordinate with the active construction project contractor, Cunningham Excavation, as required to complete the required work without impacting Cunningham Excavation's operations. The successful bidder will be required to supply all labor, material, and equipment to perform all sewer collection system replacement and improvements according to specified documents, construction locations, and details and as directed by the City Engineer including, but not limited to the following: Northern Massey Street Outfall Bypass 1. Earthwork Cuts/Fills 2. Construction of 15' W x 25' L Plunge Pool 3. Construction of 244 LF of 6' Wide Drainage Swale 4. Installation of 539 LF 30" SICPP Storm Pipe and (4) Galv. End Sections 5. Construction of 10' W x 25' L Rip Rap Channel 6. Construction of 20.5' W x 18' Long Rip Rap Outlet Protection 7. Reconstruction of 1,750 SF of Asphalt Access Drive 8. Reconstruction of 715 SF of Crushed Stone Access Drive 9. Topsoil, Mulch, Seeding, and Restoration Southern Massey Street Outfall Bypass 1. Tree Clearing 2. Removal of Existing Storm Structure and 67 LF of 15" Storm Pipe 3. Earthwork Cuts/Fills 4. Installation of (1) 4' Dia Storm Manhole 5. Installation of 285 LF 18" SICPP Storm Pipe and (1) Galv. End Sections 6. Construction of 15.5' W x 14' Long Rip Rap Outlet Protection 7. Construction of 345 LF of 6' Wide Drainage Swale 8. Topsoil, Mulch, Seeding, and Restoration The project site is located at 901 Rail Drive on the property of Renzi's Foodservice within the Cityof Watertown. The successful contractor will be required to provide all labor, materials, machinery, tools, equipment andothermeans of construction necessary and incidental to the completion of the work shown on the plans anddescribedinthe bidding and contract documents The successful company must review the INSURANCE AND BONDING CHECKLIST sheet, and provide all insurances and bonds, that will cover any type of work being done on this project. All insurance forms, like that for liability (ACORD 25) or Workmen's Comp (U-26.3 or C-105.2), must have a principal office in New York State or be authorized to do business in New York State. The City of Watertown must be listed under certificate holder on the forms. All insurances must be active for the duration of the job, and all insurance forms must reflect that fact. For use in all documents the City of Watertown, New York, is (the "Owner") and THECHOSENQUALIFIEDCOMPANY, is (the "Contractor"). The City Council reserves the right to waive any informality in or to reject any or all bids. Each bidder must deposit with his bid, security in the amount of not less than five per centum (5%) of the bid in the form and subject to the conditions provided for in the Information for Bidders. The successful bidder will be required to furnish a payment and performance bond in the amount of not less than 100% of the total amount of the accepted bid and in such form and having as surety thereon such surety company or companies as are approved by the City Council. Insurance carrier must have principal office in New York State or be authorized to do business in New York State. Attention of bidders is particularly called to the requirements as to conditions of employment to be observed and minimum wage rates to be paid under this contract. The Work will be substantially completed by December 9, 2022. The contractor has 30 days to complete the project after the date when the Contract Times commence to run as provided in Article 4.01 of the General Conditions.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents