Similar Projects
Loris Middle School New Parent Loop Road
Term Contract
Results
Less than $1,084,700 est. value
Loris, SC 29569

Grier Crossing Drainage Project
Results
SC

Melody Lane and South Dogwood Drive Drainage Project
Results
Less than $297,534 est. value
SC

Drainage Improvements North Side
Post-Bid
Aynor, SC 29511

Arts and Innovation District Phase 1A
Results
Myrtle Beach, SC 29578

Ascott Valley Industrial Park Infrastructure
Results
Conway, SC 29526

Dogwood Swash Culvert Replacement
Results
Surfside Beach, SC 29575

SC Highway 90 Outfall Ditch Project
Results
Conway, SC

Woodcreek Pipe Relocation
Post-Bid
Conway, SC 29528

Conway WWTP Drainage and Paving Services
Results
Conway, SC 29527

Conway WWTP Erosion Control Project
Results
Conway, SC 29526

Upgrading Timber Supported Bridges and Pipe to Box Culverts
Renovation
Bidding
Conway, SC

MBWWTP Tank Drainage Rehabilitation Submersible Pumps
Results
Myrtle Beach, SC 29579

25th Avenue South Header Pipe
Results
Myrtle Beach, SC

Reinforced Concrete Pipe
Results
Conway, SC

Last Updated 05/01/2020 09:09 AM
Project Title

Pond 4 And Pond 6 Maintenance and Upgrades Project

Physical Address View project details and contacts
City, State (County) Conway, SC 29528   (Horry County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project site is the Horry County Solid Waste Authority Landfill Facility located at 1886 SC Highway 90 approximately 5 miles southeast of Conway, South Carolina. The project consists of labor, materials, tools, equipment, and incidentals necessary to complete: • Temporary erosion and sedmentation controls, site preparation, and dewatering of two existing stormwater detention basins. • Excavation of existing rock dam outlet materials from Pond 4 and Pond 6 and stockpiling in owner-designated location. • Excavation of accumulated sediments and stockpiling on Class Three landfill. • Installation of new riser structure, outlet pipe, and filter diaphragm at Pond 4 and Pond 6. • Install approximately 8,000 cy backfill from owner-provided onsite borrow area to raise existing pond embankments. • Site restoration and seeding.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents