Similar Projects
SR-147 Culvert Replacement - Drainage
Infrastructure
Bidding
$500,000 to $1,500,000 est. value
Spanish Fork, UT 84660

Airport Road Traffic Signal - New Roadway and Intersection
Post-Bid
Eagle Mountain, UT

UDOT Drainage Repair US 89 MP 340.10 on the Left Side of the Road
Infrastructure
Post-Bid
Orem, UT 84097

Traverse Mountain Emergency Watershed Protection
Results
Lehi, UT 84043

Lower School House Springs - Phase II
Results
Less than $350,000 est. value
Lehi, UT

UDOT Pavement and Approach Slab Stabilization and Lifting AVL
Term Contract, Infrastructure
Post-Bid

Construction of the 2021 Provo City Lakeview Parkway Phase 4
Results
Provo, UT

Uintah Indian Irrigation Project
Term Contract
Post-Bid
$471,000 est. value

New Bingham Highway Detention Park
Results

2022 Scera Park Pool Drainage Project - Phase I
Infrastructure
Post-Bid
Orem, UT 84057

Saratoga Springs Lake Mountain Zone 2 South Pond and Losee Canyon Debris
Results
Saratoga Springs, UT

UDOT Lehi MS4 project
Results
Lehi, UT 84043

Debris Flow Mitigation Project
Term Contract
Results
Orem, UT

Greater Fremont Watershed In-Channel Structures
Infrastructure
Results
UT

2021 Storm Water Project
Infrastructure
Results
$580,000 to $710,000 est. value
Orem, UT 84097

Reported 07/07/2022 12:15 PM
Project Title

South Fork 24" Concrete Pipe Replacement/Lining - City Of Provo

Physical Address View project details and contacts
City, State (County) Provo, UT 84604   (Utah County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected July 2023
Bids Due View project details and contacts
Estimated Value $800,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work for a water / sewer project in Provo, Utah. Conceptual plans call for site work for a water / sewer project. Replacement/lining of existing spring collection lines to improve integrity of the pipe and increase its useful life. The project is included in the city's 2023-2027 Capital Improvement Program (CIP). As of July 6, 2022, further details regarding design and construction have not been identified.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents