Similar Projects
Culvert Pipe Replacement Tranter Ave at Canal C-41R
Bidding
GRANT VLKRIA, FL 32909

Stormwater Pond Bulkhead Improvements
Post-Bid
FL

Orange Street Drainage Improvements
Post-Bid
Melbourne Beach, FL 32951

Culvert Pipe Replacement - Unit 18
Results
Less than $225,000 est. value
Palm Bay, FL 32907

Baseflow Basin Project
Results
Melbourne, FL 32940

Drainage Repair
Results
Less than $400,000 est. value

B-5 2nd Avenue / Riverside Drive Off-Line Retention Area
Results
$136,985 est. value
Indialantic, FL

Fabric Formed Revetment Installation Services
Term Contract
Results
$100,000 est. value
Melbourne, FL 32901

Culvert Pipe Replacement – Waterbury Avenue at C-39 and Freehold Avenue at C-41R
Results
Less than $821,320 est. value
Palm Bay, FL 32907

Culvert Pipe Replacement - Jacobin @ C-60
Results
Palm Bay, FL

Oceana Beach Access Dune Crossover
Results
$28,876 est. value
Satellite Beach, FL 32937

Lift Station F04 Seawall Replacement
Results
$45,000 est. value
Merritt Island, FL 32940

Culvert Pipe Replacement - Units 24 and 25
Results
Less than $1,295,000 est. value
Palm Bay, FL 32907

Dredged Material Management Area BV-11 Construction
Results
$1,000,000 to $5,000,000 est. value
FL

Desilt and Video and Pipe Lining
Results
Less than $600,000 est. value

Last Updated 04/29/2021 10:51 AM
Project Title

Culvert Pipe Replacement Emerson Drive at Canal C-51

Physical Address View project details and contacts
City, State (County) Palm Bay, FL 32907   (Brevard County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $455,665
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project is comprised of the removal, disposal, replacement, and restoration of two separate, individual culvert crossings along the Melbourne Tillman (MT) Water Control District (WCD) Canal on Emerson Drive @ MT C-51. Construction of the project will be a turn-key and will include all aspects of work including but not limited to: removal of the existing failed two culvert pipes, furnishing and installing an 8’ x 5’ concrete box culvert, and all associated material, equipment, labor, maintenance of traffic, traffic detours, mobilization, erosion control, clearing and grubbing, excavation, dewatering, demolition, de-mucking, disposal of unusable materials, new fill, base rock under pipe and roadway, compaction of fill, stabilization, testing, restoration of road including pavement installation, procurement and installation of selected structures, utility conflict coordination and relocations, final clean up, sodding of disturbed areas, thermoplastic striping, as-built plans, and permit closure as applicable as per the provided construction plans and specifications.

Details

Division 31 - Earthwork, Clearing and Grubbing, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents