Similar Projects
Reservoir Rehabilitation
Bidding
Tucson, AZ

16" Water Main - Signal Butte Road, Pecos Road to Germann
Bidding
$1,400,000 to $1,600,000 est. value
Mesa, AZ 85213

Water Supply And Distribution System Improvements
Post-Bid
Whetstone, AZ

Kyrene Middle School Underground Piping Replacement
Term Contract
Post-Bid
$3,200,000 est. value
Tempe, AZ 85284

Lower Greasewood Water System Improvements
Results
$6,000,000 to $7,000,000 est. value
Fort Defiance, AZ

The Grid Mixed Use Project Site Improvements CMAR
Renovation
Results
$2,500,000 to $4,500,000 est. value
Mesa, AZ 85201

Festival Ranch Planning Area 2 Kerry Lane Infrastructure Water Line and Offsite Water Line
Bidding
Buckeye, AZ

Blanca Wastewater System Improvements
Post-Bid
Nogales, AZ 85621

Construction of a Water and Sewer Line
Results
Less than $332,464 est. value
Tolleson, AZ 85353

Coconino Estates Phase II Improvements
Bidding
Flagstaff, AZ

VA Tucson Upgrade Water Infrastructure System
Post-Bid
$2,000,000 to $5,000,000 est. value
Tucson, AZ

Water Meters
Results
Glendale, AZ 85301

Professional Services for Water Main Replacements
Bidding
$5,000,000 est. value
Chandler, AZ

Water Loading Station Maintenance
Post-Bid
Fort Defiance, AZ 86504

Job Order Contracting Services For Sewer Main And Manholes
Results
Chandler, AZ

Last Updated 09/10/2020 10:40 AM
Project Title

Bonita Waterline Phase IV and V Cos Project

Physical Address View project details and contacts
City, State (County) Safford, AZ 85546   (Graham County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,824,008
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the following Work: This project is funded by the Water Infrastructure Finance Authority of Arizona; therefore, Davis Bacon Wages do apply as well as the buy American Iron and Steel (AIS) Act. This project is the for the construction of the next two phases of the Bonita Canyon delivery pipeline known as Phase IV and V. The purpose of the proposed Phase IV and V water pipeline improvements is to increase water transmission conveyance capacity to the City of Safford and to improve the reliability of service throughout the City of Safford`s water system. Phase IV of the Bonita pipeline replacement project consists of replacement of approximately 6,700 linear feet of 10-inch diameter pipe with a 12-inch diameter pipe. Phase IV begins approximately 350 feet southwest of the intersection of Lone Star Road and US Highway 70, and continues east to the terminus of the Phase III. The proposed alignment of the new 12-inch diameter Phase IV pipeline is indicated on Figure 2, Bonita Phase IV & V Alignment, and follows an alignment that is essentially parallel to the existing 10-inch diameter pipeline. Other than a small portion of the proposed pipeline, the project is located within the Arizona Department of Transportation (ADOT) right-of-way. The proposed Phase IV pipeline project will include one boring beneath the Arizona Eastern Railroad (AZER) adjacent to the west of the intersection of Lone Star Road and US Highway 70. The existing railroad will be bored using a 30-inch diameter schedule 20 steel casing pipe. The carrier pipe within the casing pipe will be a 12-inch diameter class 350 restrained joint ductile iron pipe. Phase V of the 10-inch diameter Bonita pipeline replacement project consists of the replacement of approximately 8,500 linear feet of pipe with a 12-inch diameter pipe. Phase V will keep the same existing pipeline alignment along Lonestar Road. The proposed pipeline will commence east of the intersection of Highway 191 on Lonestar Road, then continue to the west along Lonestar Road and connect to the west end of the Phase IV water pipeline. Two above ground wash crossings are planned for the Phase V portion of the project. The eastern crossing will be across Stockton Wash. The western crossing will be across Graveyard Wash. Both portions of the project shall include all excavation, bedding, backfill, pavement, and patching necessary to complete the work in accordance with the project plans and specifications.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents