Similar Projects
Last Updated | 08/26/2019 10:07 AM |
Project Title | Clarion University - Modification of Facilities for ADA Compliance |
Physical Address | View project details and contacts |
City, State (County) | Clarion, PA 16214 (Clarion County) |
Category(s) | Education |
Sub-Category(s) | College/University |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project includes General, HVAC, Plumbing and Electrical Construction. 1. Moore Hall: Construct a new addition containing a new front-opening 3-stop elevator, new entrance vestibule, new elevator lobby, and new exterior entrance stairs to the building. Renovate existing interior spaces to create two new restrooms. Renovate other areas affected by the construction as described in the plans. Provide and install new ADA compliant signage throughout the building. Replace existing door hardware with new ADA compliant hardware. Demolish existing garage and porch. Add new landscaping, walkways, ramps and steps at new entrances and at demolished garage. 2. Stevens Hall/Special Ed Building: Construct a new addition containing a new front-and rear opening 5-stop elevator, new entrance vestibule, new elevator lobby, and new exterior entrance stairs. Renovate all existing restrooms. Provide and install new ADA compliant signage throughout the building. Replace existing door hardware with new ADA compliant hardware. Add new landscaping at new entrance addition as described in the drawings, including new grading and new concrete stairs, site walls, and sidewalks down to street level. 3. Estimated Range: 1. General Construction = $2,000,000 to $4,000,000. 2. HVAC Construction = $100,000 to $300,000 3. Plumbing Construction = $200,000 to $400,000 4. Electrical Construction = $300,000 to $500,000 |
||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |