Similar Projects
Western Multiple Award Task Order Contract (MATOC) for Horizontal Construction
Design
$2,000 to $4,000,000,000 est. value
Tucson, Yuma, AZ - El Centro, San Diego, CA

Gravel Road Maintenance Services
Term Contract
Bidding
AZ

AZ FLAP 202(2) Red Cloud Mine Road
Post-Bid
$1,500,000 to $2,500,000 est. value
Yuma, AZ

Civil Site Work IDIQ for Interior Region 8
Post-Bid
$25,000 to $500,000 est. value
Glendale, Yuma, AZ

Asphalt Sealant and Services
Term Contract
Results
Yuma, AZ

Pavement Preservation Services
Term Contract
Results
Less than $300,000 est. value
Yuma, AZ

WAPA (DSW Region) General Site Work/Concrete Construction MATOC
Post-Bid

AZ FTBR Levee Road (1) Pave Levee Road
Results
$1,000,000 to $2,000,000 est. value
Yuma, AZ 85364

Asphalt Repair and Re-Pavement Materials and Services
Term Contract
Post-Bid
Buckeye, Douglas, Florence, Globe, Goodyear, Phoenix, Safford, Saint Johns, Somerton, Tucson, Winslow, AZ 85607

Catalina Drive and Palo Verde Street Pavement Replacement
Results
Yuma, AZ

Cesar Chavez Avenue Reconstruction Project
Results
$1,000,000 to $1,300,000 est. value
Somerton, AZ

15th Street - Avenue A Intersection Improvement Project
Results
Less than $914,843 est. value
Yuma, AZ 85364

System Preservation (Restoration/Rehab/Resurface)
Results
Less than $3,600,000 est. value

Fulton St. and Council Avenue Sewer Main and Roadway Improvements Project
Results
$500,000 to $600,000 est. value
Somerton, AZ 85350

2nd Avenue Reconstruction 8th Street to 13th Street
Results
Yuma, AZ 85364

Reported 12/03/2021 12:00 AM
Project Title

San Francisco Avenue Improvements

Physical Address View project details and contacts
City, State (County) Wellton, AZ   (Yuma County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes but is not limited to the following work within the Town of Wellton, Arizona: approximately 2,349 lineal feet of vertical curb and gutter, sidewalk, sidewalk ramps, cross gutter, storm drain catch basins, 5,792 square yards of pavement, and 1,572 lineal feet of 6-inch PVC watermain. Project also includes existing asphalt removal, relocating existing fences and walls, storm drain catch basins, and survey monuments, and other work incidental to the project.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents