Similar Projects
Skiff Point
New Construction
Design
Clearwater, FL 33767

Hathaway Park Ramp and Boarding Pier Repairs
Infrastructure
Bidding
Punta Gorda, FL 33982

West Martello Seawall Hurricane Repairs
Infrastructure, Alteration
Bidding
Key West, FL 33040

Construction Management at Risk Services for Kingfish Boat Ramp Improvements
Post-Bid
Less than $4,500,000 est. value
Holmes Beach, FL 34217

MRD - 12Nov2020 - Installation of Waterways Signs, Lights and Pilings
Post-Bid
FL

Repair Waterfront and Storm Sewer Systems at U.S. Coast Guard Station Panama City, FL
Results
$500,000 to $1,000,000 est. value
Panama City, FL 32408

Lignumvitae Key Botanical State Park - Repair and Renovate Dock
Results
Islamorada, FL 33036

The Wharf
New Construction - 11,982 SF
Construction
$965,056 est. value
Saint Augustine, FL 32084

Bay Point Marina
New Construction, Infrastructure
Construction
$10,000,000 est. value
Panama City, FL

Fender Rehab - SR 518 / Eau Gallie High Level Bridge 700184 Fender Rehab
Infrastructure
Bidding
$1,121,864 est. value
FL

Repairs to East Side of Pier Railing
Post-Bid
Deerfield Beach, FL 33441

F--Debris Removal from FlL Bay and Ever
Results
Everglades, FL

Berth 268 Rehabilitation
Infrastructure
Bidding
Tampa, FL

Depot Facility Bulkhead Repairs
Post-Bid
$1,000,000 to $2,000,000 est. value
Jacksonville, FL

Rebuild UPH STA Ponce de Leon Inlet, New Smyrna Beach, FL
Results
$100,000 to $6,000,000 est. value
New Smyrna Beach, FL 32168

Reported 02/25/2022 12:00 AM
Project Title

Pelican Harbor Marina - Dredging Around D Dock

Physical Address View project details and contacts
City, State (County) Miami, FL 33138   (Miami-Dade County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $400,000
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Furnish all labor, equipment, and materials required to comply with the intent of the WORK described in the contract documents including but not limited to the maintenance dredging of approximately 14,180 square feet of accumulated sediment to a maximum depth of -8.0 N.A.V.D. ( -6.12 feet NOAA Mean Low Water) in Dock D at Pelica Harbor Marina.

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents