Similar Projects
Mccoy Road Facility Improvements Water Line and Sewer Line
Infrastructure
Bidding
Orlando, FL 32885

UCF Campus Infrastructure and Utility Production Facility - Industrial Mechanical and Wet-Utility Piping Work
Term Contract
Results
Orlando, FL 32826

Residential and Commercial Backflow Testing and Repairs
Term Contract
Results
Orlando, FL 32801

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Meter Boxes
Term Contract
Results
Orlando, FL 32801

Infrastructure Locator Contractor
Term Contract
Results
Orlando, FL 32801

Master Agreement for Water Distribution Construction Services, Lake Nona Boulevard Water Main Extension, Water Main Extension Boggy Creek North Phase 2A, and Neighborhood R and R Program Project Waterfront Estates Subdivision
Results
Orlando, FL 32824

South Water Reclamation Facility Flow Meter Improvements
Results
Less than $2,186,000 est. value
Orlando, FL 32819

McCoy Road Facility Watermain Improvements Project
Results
Orlando, FL 32812

Mandarin Road Loop Water Main Connection
Results
Less than $356,435 est. value
Jacksonville, FL 32223

Water Main Improvements on Military Trail, Central Boulevard, and at the Water Treatment Facility
Results
Lake Worth, Orlando, FL 33463

Construction of a Potable/Drinking Water Main and Sewer Force Main
Results
Apopka, FL 32712

Water Line Stop Contractor
Infrastructure
Results
Orlando, FL

Econlockhatchee Trail Parallel Water Main
Infrastructure
Results
$1,079,498 est. value
Orlando, FL

Hiawassee Road Force Main Replacement at SR 408
Infrastructure
Results
$1,342,842 est. value
Orlando, FL 32835

Last Updated 10/18/2021 07:01 AM
Project Title

Conserv I 36 Reclaimed Water Main Extension

Physical Address View project details and contacts
City, State (County) Orlando, FL 32824   (Orange County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,196,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of approximately 2,680 feet of 36-inch ductile iron pipe reclaimed water main, plus modifications to the existing yard piping at the Water Conserv I WRF Effluent Pump Station, located at 1140 I Boggy Creek Road. 'The work includes installation of all piping, fittings, valves, appurtenances, testing, and all incidentals necessary to provide the installed reclaimed water main system, complete, and ready for service. The project work also includes installation of 1,100 feet of PVC conduit bank, consisting of three parallel 2-inch diameter conduits, plus four pull boxes

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents