Similar Projects
Center for Creative Engineering - San Luis Obispo - California State University System
New Construction, Infrastructure - 41,000 SF
Conception
$70,284,000 CJ est. value
San Luis Obispo, CA 93401

East Branch Streetscape - 5671 - City of Arroyo Grande
Infrastructure
Conception
$488,835 CJ est. value
Arroyo Grande, CA 93420

Conservmart / San Luis Obispo
New Construction, Infrastructure - 3,711 SF
Design
$1,000,000 CJ est. value
San Luis Obispo, CA 93401

North Main Street Mixed-Use Development
New Construction, Infrastructure - 11,200 SF
Design
$5,000,000 CJ est. value
Templeton, CA 93465

Irrigation, Planting and Concrete Work
Infrastructure
Bidding
$1,190,000 CJ est. value
Oceano, CA 93445

RFQ/RFP D/B - Student Housing Program
New Construction, Infrastructure
Bidding
$275,000,000 CJ est. value
San Luis Obispo, CA 93405

San Luis Obispo High School Modernization Project - Site Work Only
Renovation, Infrastructure
Post-Bid
$3,000,000 est. value
San Luis Obispo, CA 93401

Community Electric Vehicle Charging Infrastructure Deployment project
New Construction, Infrastructure
Post-Bid
$400,000 CJ est. value
San Luis Obispo, CA 93401

EWWTP Well 3 Drilling
Infrastructure
Results
$587,085 CJ est. value
Elmira, CA 95625

Install Beautification, Transportation Art, and Safety Measure Enhancement
Infrastructure
Results
$589,402 CJ est. value
Atascadero, CA 93422

Verde/Luneta/Ramona/Broad Sewer Replacement
Infrastructure
Construction
$1,360,489 CJ est. value
San Luis Obispo, CA 93401

Santa Rosa At Monterey Intersection Improvements
Infrastructure
Construction
$821,564 CJ est. value
San Luis Obispo, CA 93401

Idle Hands Mixed-Use Building
New Construction, Infrastructure - 8,424 SF
Pending Verification
$2,500,000 CJ est. value
San Luis Obispo, CA 93401

Park Fermé
New Construction, Infrastructure, Renovation - 6,873 SF
Pending Verification
$1,900,000 CJ est. value
Paso Robles, CA 93446

Corporation Yard Permimeter Fence Replacement - 1000509 - City of San Luis Obispo
Infrastructure
Conception
$450,000 CJ est. value
San Luis Obispo, CA 93401

Last Updated 07/20/2023 05:35 PM
Project Title

Front Street Lift Station Rehabilitation

Physical Address View project details and contacts
City, State (County) Grover Beach, CA 93433   (San Luis Obispo County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected August 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $165,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

In general, the Base Bid Work shall be rehabilitating the existing lift station. The work includes, but is not limited to, replacement of everything in the wet well including the hatch, pumps, piping, fittings and all appurtenances, coating of the wet well, bypass pumping, and traffic control. The contractor shall also coordinate with the City's controls designer/contractor for controls integration work, as needed. Controls integration work shall be performed and paid under a separate contract directly between the City and the controls designer/integrator. This project was originally bid in August 2022 but withdrawn so that the City could contract controls design and integration services and provide direction to bidders to coordinate with the City's selected controls design and integration contractor during this project. Each bid shall be accompanied by cash, certified or cashier's check, or bidder's bond for not less than ten percent (10%) of the amount of the base bid, made payable to the City of Grover Beach. Bidder's inquiries shall be submitted in writing via e-mail to the City of Grover Beach, Public Works Department, at: publicworks@groverbeach.org. The cutoff time that the City will accept bidder's inquiries is 5:00 p.m. on July 13, 2023. The City will respond to bidder's inquires via bidding addenda. Any such inquiries, submitted after the cutoff time of receiving bidder's inquiries, will not be treated as a bid protest. The right is reserved by the City of Grover Beach to reject any or all bids, to evaluate the bids submitted, and award the Contract to the lowest responsible bidder. The City further reserves the right to waive any informalities or minor irregularities in the bid. The estimated opinion of probable construction cost for this Base Bid Work is approximately $165,000. This does not include controls work which is to be performed and paid under separate contract.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents