Similar Projects
Drive Thru Restaurant
New Construction - 2,264 SF
Conception
Westfield, MA 01085

230 Southampton Road Commercial
New Construction, Renovation - 8,500 SF
Design
$500,000 to $1,000,000 CJ est. value
Westfield, MA 01085

Holyoke Landing Redevelopment
New Construction - 21,500 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Holyoke, MA

Aldi #85
New Construction - 20,250 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Westfield, MA

Target #T1232 - Cafe Remodel
Renovation - 1,100 SF
Post-Bid
Holyoke, MA 01040

Dunkin Donuts
New Construction, Demolition - 2,100 SF
Construction
$500,000 to $1,000,000 CJ est. value
Westfield, MA

Citgo
Addition - 1,632 SF
Construction
Springfield, MA

Mobil Gas Station
New Construction - 5,600 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Springfield, MA 01107

Five Guys
Renovation - 2,700 SF
Pending Verification
Westfield, MA 01085

Dunkin
New Construction - 2,280 SF
Design
$500,000 to $1,000,000 CJ est. value
Springfield, MA 01104

Dewey's Lounge
Renovation
Construction
Springfield, MA 01103

Irish Ale House
Addition
Pending Verification
Springfield, MA 01105

Drive Thru Restaurant Union Square Plaza
New Construction - 2,500 SF
Design
$500,000 to $1,000,000 CJ est. value
Westfield, MA 01085

McDonald's
Renovation
Pending Verification
Springfield, MA 01119

Log Cabin Restaurant
New Construction
Design
Holyoke, MA 01040

Last Updated 08/18/2021 04:29 PM
Project Title

Westpark Development

Physical Address View project details and contacts
City, State (County) Westfield, MA 01085   (Hampden County)
Category(s) Commercial
Sub-Category(s) Food/Beverage Service, Gas Station, Supermarket/Convenience Store
Contracting Method Bids by Invitation.
Project Status Construction Commenced July 2021, No Sub Bids Needed
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project includes electric charging stations.

Details

7,600 SF - 1 Gas Station, 5,400 SF New Construction Building, Supermarket/Convenience Store, 1 Food/Beverage Service, 2,200 SF Renovation, Food/Beverage Service, Renovation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Foodservice Shelving, Food Dispensing Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines.
Division 12 - Furnishings, Countertops, Rugs and Mats, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Liquid Fuel Distribution, Gasoline Distribution, Gasoline Piping, Gasoline Pumps, Diesel Fuel Distribution, Diesel Fuel Piping, Diesel Fuel Pumps, Fuel-Storage Tanks, Underground Fuel-Storage Tanks.
Division 48 - Electrical Power Generation, Electrical Power Control Equipment, Electrical Power Generation Battery Charging Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents