Similar Projects
Phase II Drainage Project at St James Farm
Infrastructure
Bidding
$300,000 est. value
Winfield, IL 60190

Entry Plaza
Infrastructure
Bidding
$460,000 est. value
Addison, IL 60101

2021 Clow Creek Shoreline Restoration
Post-Bid
Naperville, IL

Pavement Resurfacing
Post-Bid
Naperville, IL

2021 Parking Lot Resurfacing and Asphalt Roadway Patching Program
Results
Glen Ellyn, IL

2021 Parking Lot Resurfacing and Asphalt Roadway Patching Program
Results
Glen Ellyn, IL

Hawthorne Hill Woods, Phase 1 - Culvert Replacements Project
Infrastructure
Bidding
$200,000 est. value
Woodridge, IL 60517

Hot-Mix Asphalt Surface
Post-Bid
Lisle, IL

2021 Contract Paving
Results
Elmhurst, IL

Asphalt Replacement Project
Infrastructure
Bidding
$100,000 est. value
Oak Brook, IL

Utility and Roadway Improvements Project 20001 Phase 1
Post-Bid
Glen Ellyn, IL

2020 Stormwater Detention Renovation
Results
Clarendon Hills, IL

2022 Asphalt Patching Program
Infrastructure
Bidding
$400,000 est. value
Lisle, IL

2021 Hardscape Improvements
Post-Bid
Aurora, IL 60504

Hillside Addition And Roosevelt Highlands Subdivision Rehabilitation
Renovation
Results
Less than $900,000 est. value
West Chicago, IL

Last Updated 07/06/2022 01:21 AM
Project Title

Motor Fuel Tax (MFT) Street Program

Physical Address View project details and contacts
City, State (County) Addison, IL   (DuPage County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage, Sidewalks/Parking Lot, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This rehabilitation project consists of improvements to various roads in the Village as shown in the plans. The street program generally consists of HMA removal, pavement patching, leveling binder, prime, and surface course, PCC curb & gutter remove & replace, longitudinal joint sealant, and pavement marking. In addition to the general work described above, the street program also includes removal and disposal of unsuitable material, aggregate subgrade improvement, storm sewer, pipe underdrain, drainage/utility structure work, driveway apron and sidewalk replacement, and the restoration along the affected portions of work limits, as directed.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents