Similar Projects
Washington Street Redesign - Newton
Infrastructure
Design
$3,000,000 est. value
Newton, MA 02465

Union Avenue - City Of Framingham
Alteration
Design
$11,000,000 est. value
Framingham, MA

727 Massachusetts Avenue Hotel Addition
Addition, Demolition, Renovation, Infrastructure - 51,250 SF
Bidding
$20,000,000 CJ est. value
Boston, MA 02203

Construction of Modular Office Buildings and Associated Site Work at the Vine Street and West Grove Street (Route 28) Maintenance Depots
New Construction, Infrastructure
Bidding
$1,387,180 CJ est. value
Middleborough, MA 02346

Young Tree Pruning
Term Contract
Sub-Bidding
$120,000 CJ est. value
Cambridge, MA 02138

Service Contract for Tree and Brush Grinding and Disposal
Term Contract
Sub-Bidding
$40,000 CJ est. value
Melrose, MA 02176

Milling and Overlay of Misc. Roads (A)
Post-Bid
$675,000 est. value
Hudson, MA

2021 Roadway Rehabilitation and Related Work
Post-Bid
$2,300,000 est. value
Everett, MA

Scheduled and Emergency HMA Pavement and Berm Repairs at Various Locations
Results
Less than $4,330,525 est. value

Scheduled and Emergency Pavement Repairs at Various Locations in Area D (Barnstable County)
Results
Less than $470,505 est. value

Central Square Mixed-Use Development
New Construction, Build-out, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Chelmsford, MA 01824

Pleasant Street Apartments
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Tewksbury, MA 01876

Riverside Station
New Construction, Infrastructure - 292,722 SF
Design
$300,000,000 CJ est. value
Newton, MA 02462

Newton Centre Playground Resurfacing Improvements - Rebid
Infrastructure
Bidding
$357,159 CJ est. value
Newton, MA 02459

New Construction of 21 Units of Wood Frame Modular Housing for the Elderly - Sub
New Construction, Infrastructure
Sub-Bidding
$9,500,000 CJ est. value
Somerville, MA 02143

Last Updated 08/05/2022 04:34 PM
Project Title

Granite and Concrete Curbing Installation for FY23

Physical Address View project details and contacts
City, State (County) Holliston, MA 01746   (Middlesex County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $340,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Town of Holliston is seeking sealed bids to provide labor and materials for Granite and Concrete Curbing Installations and Gravel for Sidewalks. The Town will award the contract to the lowest responsive and responsible bidder. The Town reserves the right to reject any and all bids as determined to be in the best interests of the Town. Unless sooner rejected or accepted, all bid proposals must be firm and continue in effect for ninety (90) calendar days following the date of bid opening. CURBING: The curbing shall be measured by the linear foot along the completed exposed face of the curb, installed and accepted. Payment will be made at the unit price bid per linear foot for curbing, and will be full compensation for all material, labor, and equipment necessary to complete the work, including precast curb (straight and curved), grouting, concrete fill in front of curb, grade control, driveway and ramp sections, and all else necessary to complete the work. GRAVEL BORROW: Gravel borrow shall be measured by the cubic yard. If weight slips are available, the weight shall be converted to cubic yards based on one cubic foot of gravel weighing 120 lbs. Payment will be made at the unit bid price per cubic yard for gravel borrow, and will be full compensation for all material, labor, and equipment necessary to complete the work, including preparing subgrade, placing gravel to grade, compacting, and any related work necessary to complete the work. CLEARING & GRUBBING: Clearing and grubbing shall be measured by the square yard. Payment will be made at the unit bid price per square yard and will be full compensation for all material, labor, and equipment necessary to complete the work. Work under this proposal will be performed during fiscal year 2023, from July 1, 2022 until June 30, 2023. The successful Bidder must enter into the Town's Standard Form Agreement, attached hereto. Any prospective contractor (bidder) requesting an interpretation of existing specifications of terms and conditions must do so in writing by TBD, addressed to Anne Kellogg at the Holliston Highway Department, 63 Arch Street, Holliston, MA 01746 or via email to Anne Kellogg at: kellogga@holliston.k12.ma.us

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents