Similar Projects
Replace Str Bridge, Approach Grading, Grading, AC Surfacing - US 12
Demolition, New Construction, Infrastructure
Conception
$16,118,000 CJ est. value
Selfridge, ND 58568

Replace Str Bridge, Approach Grading, Grading, AC Surfacing - US 12
Demolition, New Construction, Infrastructure
Conception
$16,118,000 CJ est. value
Selfridge, ND 58568

Construction Standing Rock Sewer Main Replacements
Infrastructure
Bidding
$1,500,000 CJ est. value
Cannon Ball, ND 58528

Construction Standing Rock Sewer Main Replacements
Infrastructure
Bidding
$1,500,000 CJ est. value
Cannon Ball, ND 58528

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Mill and Overlay
Infrastructure
Results
$2,500,001 to $3,000,000 est. value
ND

Structure Replacements
Demolition, New Construction, Infrastructure
Post-Bid
$5,000,000 CJ est. value
Selfridge, ND 58568

ND 31, JCT ND 25 (Hannover) N to JCT ND 200A; ND 24, JCT ND 6 N to S of Fort Yates; and ND 31, JCT ND 200A N to Harmon Ave (Stanton) - Micro-Mill, Slurry Seal and Micro-Surfacing
Infrastructure
Results
$1,000,001 to $1,500,000 est. value

Sliver Grading, Subcuts, Pipe Extensions, Pipe Rehabilitation, Structure Replacement, Milling and Rap Overlay
Infrastructure
Post-Bid
$9,000,000 CJ est. value
Selfridge, ND 58568

ND 6, ND/SD STATE LINE N to near JCT CMC 4324 (Selfridge) - Seal Coat and Incidentals
Infrastructure
Results
$200,001 to $40,000 est. value
ND

Last Updated 01/17/2023 02:09 AM
Project Title

AC Surfacing, Mill, AC Resurfacing, Pipe Work - US 12

Physical Address View project details and contacts
City, State (County) Selfridge, ND 58568   (Sioux County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2024
Bids Due View project details and contacts
Estimated Value $2,886,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

US12 - Fm 7 E of Perkins Co Line to 2 E, & at McIntosh. As of January 17, 2023, the project is in Conceptual status. Anticipated Construction year is 2024. SDDOT - AC Surfacing, Mill, AC Resurfacing, Pipe Work - US 12 *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents