Similar Projects
Runway Precision Approach Path Indicator - 49015 - City of Fullerton
Renovation, Infrastructure, Alteration
Conception
$250,000 est. value
Fullerton, CA 92833

Adams Avenue Active Transportation Project - City Of Costa Mesa
Alteration
Conception
$3,750,000 est. value
Costa Mesa, CA 92626

AutoZone #3001 / Anaheim
New Construction, Infrastructure - 7,000 SF
Design
$1,500,000 CJ est. value
Anaheim, CA 92801

Center Greens - City of Anaheim
Infrastructure
Design
$3,520,000 CJ est. value
Anaheim, CA 92805

Reconstruct Curb Ramps and Cold Plane Pavement With RHMA
Infrastructure
Bidding
$11,500,000 CJ est. value
Laguna Beach, CA 92651

Place RHMA-G, HMA, Slab Replacement and JPCP
Infrastructure
Bidding
$23,400,000 CJ est. value
Tustin, CA 92780

Scott Rd, Pittman Lane, And Barton Banks Rd Street Improvements
Alteration
Post-Bid
Irvine, CA 92602

Irvine Ranch Water District Well Water Treatment System
Alteration
Post-Bid
$4,500,000 est. value
Orange, CA

Transit Asset Management Plan Update
Alteration
Results
$175,000 est. value
CA

CALLE REAL Waterline Improvements
Infrastructure
Results
$880,000 est. value
San Clemente, CA 92673

San Juan Hills High School Turf Replacement Project
Infrastructure
Construction
$668,535 CJ est. value
San Juan Capistrano, CA 92675

Junior Lifeguards Building - Parking Lot Improvement - City of Newport Beach
Infrastructure
Construction
$450,000 CJ est. value
Newport Beach, CA 92663

Domingues at McVay Subdivision
New Construction, Infrastructure
Pending Verification
Huntington Beach, CA 92647

Fire Station No. 4 Replacement - City of Laguna Beach
Demolition, New Construction, Infrastructure - 9,975 SF
Pending Verification
$6,100,000 CJ est. value
Laguna Beach, CA 92651

City Hall - Cast Iron Drainage Repipe - City of Costa Mesa
Infrastructure
Conception
$300,000 est. value
Costa Mesa, CA 92626

Last Updated 11/16/2022 05:04 PM
Project Title

Arbor Access Ramp - Sewer Lateral

Physical Address View project details and contacts
City, State (County) Lake Forest, CA 92630   (Orange County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $206,750 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

**As of November 16, 2022, this project has not yet been awarded. A timeline for award has not yet been established.** This project will install a sewer lateral to the mini park at the northeast corner of Rockfield Blvd. and El Toro Rd. The proposed work will include both the public side and private side sewer service to the park for future improvements. Vendors must submit all questions pertaining to this project through the City's Online Bid Management System, by selection the Q&A tab. Questions sent directly to City Staff will not be addressed and you will be directed to submit your question(s) online. Online Q&A Yes Q&A Deadline 10/12/2022 5:00 PM (PDT) Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Project Duration 30 working days License Requirements A Type of Award Lump Sum

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents