Similar Projects
Hired Equipment Snow and Ice Control 2021-2022
Term Contract, Alteration
Post-Bid
Greenwich, CT

Fitness/Wellness Equipment for Stamford High School and Westhill High School
Alteration
Post-Bid
$50,000 est. value
Stamford, CT

Walk Thru Metal Detectors (WTMD)
Results

Walk-in Refrigerator/Freezer
Renovation
Results
$47,491 CJ est. value
Bridgeport, CT 06606

Street Sign Materials and Traffic Safety Equipment
Term Contract
Post-Bid
Danbury, CT 06810

Roof Replacement at Terry Conners Ice Rink
Renovation
Results
$2,204,800 CJ est. value
Stamford, CT 06902

RFP D/B - Scoreboards Fairfield Ludlowe High School And Fairfield Warde High School REBID
Renovation
Post-Bid
$140,000 CJ est. value
Fairfield, CT 06824

Kitchen Equipment Maintenance and Repair
Term Contract
Post-Bid
Greenwich, CT 06830

Davenport Ridge and KT Murphy Playground Equipment Repairs
Term Contract
Post-Bid
Stamford, CT 06901

Labor and Equipment for Emergency Services
Term Contract
Post-Bid
Westport, CT 06880

Dishwasher Upgrade at New Lebanon School
Renovation
Post-Bid
$35,000 CJ est. value
Greenwich, CT 06830

AHX1 Air Handler, Supply and Return Fans, Associated Variable Frequency Drives
Term Contract
Post-Bid
Bethel, CT 06801

Technology Equipment New Fairfield High School
Renovation
Post-Bid
$1,000,000 CJ est. value
New Fairfield, CT 06812

Gym Equipment for Fire Department
Renovation
Post-Bid
$11,000 CJ est. value
Shelton, CT 06484

Refrigeration / Kitchen Equipment Repair and Maintenance Services
Term Contract
Post-Bid
Bridgeport, CT 06606

Last Updated 08/11/2023 10:13 AM
Project Title

Secure Entryway Vestibule

Physical Address View project details and contacts
City, State (County) Ridgefield, CT 06877   (Fairfield County)
Category(s) Single Trades
Sub-Category(s) Equipment
Contracting Method Competitive Bids
Project Status All Bids Received, Selection Underway, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Secure Entryway Vestibule Questions regarding this RFP should be directed to Joe Morits - Director of School Facilities via email at jmorits@ridgefieldps.net. To receive consideration, all questions must be submitted by the close of business on Friday, June 30, 2023. The project is intended to be a complete turn-key installation, inclusive of: o ADA compliant extruded dark bronze aluminumm storefront constructed frame system o Five exterior pairs of doors with appropriate panic hardware including one active door hardware with electric panic hardware o All wall panels, doors, and transoms to match frame system o 1" tempered, low-E insulated glass (doors, side panels, transoms) o Cabinet electric heat units (2) o Surface mounted LED ceiling light fixtures o Document slot and voice port incorporated into identified glass panel o Suitable weather resistant carpet tiles o Patch and paint ceiling Required site work, inclusive of: o Excavation of existing sidewalk panels and backfill of location site o Form and pour new footings and new concrete frost wall foundation and slab on grade o Prep slab site with crushed stone base and rigid installation and wetproofing PROJECT SOFT COSTS TO BE INCLUDED o Building permit fees o Design and engineering o Project management/ supervision INFRASTRUCTURE NOT TO BE INCLUDED (PROVIDED BY OTHERS) o CAT 6 Network cable, cabling, and network connectivity drops o Intercom system o Access control proximity reader o Surveillance equipment o Signage o Window security film o Protective pipe bollards

Details

Division 11 - Equipment, Operation and Maintenance of Equipment, Vehicle Service Equipment, Maintenance Equipment, Unit Kitchens, Residential Equipment, Residential Appliances, Agricultural Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents