Similar Projects
Indefinite Delivery Indefinite Quantity (IDIQ) Paving at Various Locations, Washington DC, MD, & VA
Design
Less than $75,000,000 est. value
Washington, DC

Surface Coat of Various Frederick County Roadways
Bidding
$1,000,001 to $2,500,000 est. value
Frederick, MD

Replacement and Repairs of Sidewalk and Americans With Disabilities Act (ADA) Ramps (FY2022)
Bidding
Frederick, MD

Sports Complex Construction
Post-Bid
Brunswick, MD 21716

MD Rt 80
Post-Bid
Urbana, MD 21704

Emmitsburg Street Paving
Results
Emmitsburg, MD 21727

Geometric Improvements at Old Annapolis Road/Water Street Road
Results
$2,500,001 to $5,000,000 est. value
MD

Remove/Resurface Ambrosen Asphalt Parking Lot
Bidding
Less than $100,000 est. value
Frederick, MD 21701

Interstate 295 Miscellaneous Roadway Improvements
Post-Bid
$3,900,000 est. value
Wilmington, DE 19801

Resurface Washington County Line to Grindstone Run Structure 10135
Results
$5,000,001 to $10,000,000 est. value
MD

Brunswick Heritage Museum Facade Restoration
Bidding
Brunswick, MD 21716

Street Patch and Overlay
Results
$138,663 est. value
Walkersville, MD 21793

District 7 - Areawide Sidewalk Ada Upgrades in Carroll, Frederick and Howard Counties
Results

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Crack and Joint Sealing - Carroll, Frederick and Howard Counties, Area Wide
Results
$1,000,001 to $2,500,000 est. value

Last Updated 06/18/2020 10:43 AM
Project Title

Poplar Street Streetscape Improvements

Physical Address View project details and contacts
City, State (County) Myersville, MD 21773   (Frederick County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project involves the replacement of deteriorated curb and gutter, sidewalks, and driveway aprons as well as the addition of 60" sidewalks where applicable to address connectivity and ADA accessibility along both sides of Poplar Street. This project also includes signage, the addition of a crosswalk, resetting of a fire hydrant, maintenance of traffic, sediment and erosion control, and all related work.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents