Similar Projects
Redfish Harbor
New Construction
Design
Pensacola, FL 32500

NED - Ship Single Family Housing Repair Project
Results
Less than $24,280 est. value
Pensacola, FL 32503

NED - Ship Single Family Housing Repair Project
Results
Less than $42,275 est. value
Pensacola, FL 32526

Inspired Living
New Construction - 60,000 SF
Construction
$60,000,000 est. value
Pensacola, FL

NED, SHIP Single Family Housing Repair Project at 405 Mapleleaf Circle
Results
Less than $9,600 est. value
Pensacola, FL 32514

NED SHIP Housing Repair for 1029 Webster Drive
Results
Pensacola, FL 32505

Rehabilitation of the Residential Dwelling
Results
Less than $56,100 est. value
Pensacola, FL 32506

NED CDBG Housing Repair for 1224 West Maxwell Street
Results
Pensacola, FL 32501

NED SHIP Housing Repair for 195 Pine Street
Results
Less than $31,510 est. value
Cantonment, FL 32533

NED SHIP Housing Repair for 201 Pine Street
Results
Less than $38,100 est. value
Cantonment, FL 32533

NED SHIP Housing Repair for 401 Washington Street
Results
Less than $23,850 est. value
Cantonment, FL 32533

NED CDBG Housing Repair for 990 Muscogee Road
Results
Cantonment, FL 32533

NED SHIP Housing Repair for 4901 Kinnear Avenue
Results
Less than $32,500 est. value
Pensacola, FL 32506

NED Ship Housing Repair for 1506 Blossom Trail
Results
Less than $22,000 est. value
Pensacola, FL 32505

NED SHIP Housing Repair for 937 Broad Street
Results
Less than $6,400 est. value
Pensacola, FL 32534

Last Updated 05/28/2020 10:05 AM
Project Title

NED SHIP Housing Repair for 215 Opal Avenue

Physical Address View project details and contacts
City, State (County) Pensacola, FL 32505   (Escambia County)
Category(s) Residential
Sub-Category(s) Single-Family Homes
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $21,900
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Install a new 6’x6’8” - 6 panel door unit with no rot jambs, required trim, weather stripping, threshold, peephole and hardware. Both doors are to be operational. Install new lock set and dead bolt keyed to homeowner’s key. Door install will include framing as required and exterior paint work. DOES NOT INCLUDE ANY INTERIOR WORK OR INTERIOR PAINT. Detach and re-install awning. Install 2 wall mounted lights model – Progress Lighting Westport # P6013-3130K9 or equivalent at existing locations Replace deteriorated wood siding and prep to receive new vinyl siding. Prep cornice system, gable and area of wood siding to receive vented soffit, metal fascia and vinyl siding. Install vented vinyl soffit and metal fascia (68 lineal foot) with associated trim. Install vinyl siding over fan fold insulation with associated trim on gable (45’x3’), area of wood siding (15’x10’) and area around front door (4’x7’). Build ADA approved ramp at front entrance with a new 8’x5’ wood porch, ramp. Porch is to be constructed of treated pine. Install rails with pickets around front porch and ramp. Install new house numbers on front of house in a contrasting color with a minimum height of 3”. Detach and re-install data cables as required. Replace deteriorated wood siding and prep to receive new vinyl siding. Prep cornice system and area of wood siding to receive vented soffit, metal fascia and vinyl siding. Install vented vinyl soffit and metal fascia (27 lineal foot) with associated trim. Install vinyl siding over fan fold insulation with associated trim on area with wood siding (15’x9’). Detach and re-install awning. Install a 2 bulb LED dusk to dawn flood light at existing location. Replace deteriorated wood siding and prep to receive new vinyl siding. Replace deteriorated fascia (40 lineal foot). Prep cornice system and area of wood siding to receive vented soffit, metal fascia and vinyl siding. Install vented vinyl soffit and metal fascia (68 lineal foot) with associated trim. Install vinyl siding over fan fold insulation with associated trim on gable (45’x3’) and area of wood siding (12’x10’). Install a new hurricane rated exterior door unit with no rot jambs, required trim, weather stripping and threshold. Install new lock set and dead bolt keyed to homeowner’s key. Door install will include framing as required and exterior paint work. Remove existing roof covering to the decking and replace any deteriorated or damaged decking with like, kind and quality of existing materials (figure 250 Square feet.). Fasten and certify decking attachment as per Escambia County Building Code. Install self-adhering granulated modified bitumen roll roofing with manufacturers recommended secondary water barrier as per manufacturer specifications. Replace existing drip edge with new metal drip edge. Install new slant-back vents. Replace all boots with new lead or EPDM and metal boots. Trim trees over hanging roof to clear roof by approximately 10’. Remove tree trimming debris from premises Upgrade electrical system to 200 amp service, a new meter base/power pack and riser will be required.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents