Similar Projects
Milling and Overlay of Various Streets Project
Infrastructure
Bidding
Durango, CO 81301

Reconstruction of City Alleys at Various Locations
Infrastructure
Bidding
Durango, CO

Civil Site Work IDIQ for Interior Region 8
Post-Bid
$25,000 to $500,000 est. value
Glendale, Yuma, AZ

Civil Site Work IDIQ for Interior Region 8
Post-Bid
$25,000 to $500,000 est. value
Glendale, Yuma, AZ

Notice of Request for Contractor Qualifications
Term Contract
Results
Thornton, CO 80229

Peoria Street Widening Project
Results
Less than $1,058,887 est. value
Castle Rock, CO

Asphalt Repairs and Replacement Services
Term Contract, Infrastructure
Bidding
Westminster, CO

Construction of the Crack Sealing 2021
Post-Bid
Rifle, CO

Roadway Crack Sealing Project
Results
Frisco, CO 80443

2022 Chip Seal Project
Infrastructure
Bidding
Meeker, CO

2021 Road and Drainage Project
Post-Bid
Gunnison, CO

30th and Colorado Underpass
Results
Less than $10,000,000 est. value
Boulder, CO 80301

Resurfacing Work on US 287 and US 50
Infrastructure
Bidding
$5,000,000 to $20,000,000 est. value
CO

Notice# 21-20-UCB000275-Site_Asphalt Repairs 2021
Post-Bid
Less than $110,000 est. value
Boulder, CO

HPCH - Plum Creek Day Use Access Road Improvements
Results
Less than $250,000 est. value
Littleton, CO 80125

Reported 03/25/2022 12:00 AM
Project Title

Pavement Reconstruction Project Allison Avenue - Yale Place to 15th Street N8th Street - Fairview Avenue to Barr Avenue

Physical Address View project details and contacts
City, State (County) Canon City, CO 81212   (Fremont County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of the reconstruction of two separate streets that are geographically close in proximity (appx 0.5 miles apart). The reconstruction requires removal of existing road section; laying of geogrid and geofabric for sub grade stabilization; road base course; asphalt paving; concrete replacement; etc. The project entails installation of approximately: 2,100 CY of Class 6 ABC; 2400 TN of HMA; 525 LF of curb and gutter, and other associated concrete paving including sidewalks, aprons, and drive accesses.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents