Similar Projects
Replace Historic Scotty's Castle Climate Control System
Infrastructure
Design
$5,000,000 to $10,000,000 est. value
CA

CHP Death Valley Resident Post - HVAC Maintenance Services
Term Contract
Bidding
Death Valley, CA 92328

HVAC Equipment Replacement
Alteration
Bidding
$2,156,000 est. value
Rancho Cordova, CA 95655

HVAC Replacement
Term Contract
Post-Bid
$24,000 to $29,000 est. value
Alameda, CA

J041--VA Palo Alto Health Care System Chiller and Cooling Tower Maintenance Services
Term Contract
Post-Bid
Livermore, CA 94550

Better Way Electrical Service or HVAC Project
Alteration
Results
$100,000 to $300,000 est. value
Yuba City, CA 95991

EMS Upgrades at the Main Library
Alteration
Results
$347,500 est. value
Burlingame, CA 94010

Brawley Service Center HVAC Replacement
Alteration
Bidding
Fresno, CA 93722

HVAC on Call Maintenance and Repair Services
Alteration
Post-Bid
CA

Yuba County Courthouse Air Handler Unit Replacement Project
Alteration
Results
Marysville, CA 95901

HVAC
Term Contract
Bidding
Chula Vista, CA

CHP Humboldt Area Office - HVAC Maintenance Services
Alteration
Post-Bid
Arcata, Willow Creek, CA 95521

EDD Modesto HVAC Replacement
Alteration
Results
$1,839,300 est. value
Modesto, CA 95354

Southeast Water Pollution Control Plant Hvac And Mechanical Upgrades
Alteration
Bidding
$8,000,000 to $8,500,000 est. value
San Francisco, CA

CHP Quincy Area Office and Portola Resident Posts - HVAC Maintenance Services
Term Contract, Alteration
Post-Bid
Portola, Quincy, CA 95971

Last Updated 03/21/2022 02:30 PM
Project Title

Heat Pump Replacement

Physical Address View project details and contacts
City, State (County) Santa Cruz, CA 95060   (Santa Cruz County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Heat pump 2-8 is a 3 ton water source heat pump that services the MDF server room at the Santa Cruz Laboratory. This unit is wired on the emergency generator power and is heavily relied upon during power outages. The contractor shall replace and install a new Trane GEVE036 water source heat pump with: 3 ton nominal cooling, 410 refrigeration, high static blower, two way valve assembly with actuator motor. Tasks Task 1: Remove and dispose of old heat pump 2-8. Task 2: Furnish and install new Trane GEVE036 water source heat pump with 3 ton nominal cooling, 410 refrigeration, high static blower, two way valve assembly with actuator motor. Task 3: Reroute and connect existing water piping and repair where needed. Task 4: Install new 2 way B&G reducing valve assembly with new floating Honeywell actuator 24VDC motor. Task 5: Connect condensate pipe to existing drain lines and repair where needed. Task 6: Charge refrigeration, connect power, run a

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents