Similar Projects
Airport Substation Power Control Assembly
New Construction
Bidding
Loveland, CO

Construction Services for The Second Controllable Grid Interface (CGI) Project at The NREL Flatirons Campus
New Construction
Post-Bid
Boulder, CO

Request For Information: Steel Structures for Western Area Power Administration (WAPA)
New Construction, Term Contract
Post-Bid

Midway KV1A Replacement
New Construction
Results
$1,000,000 to $5,000,000 est. value
Colorado Springs, CO

AULT-Badwater-North Cody Equipment Install
Results
$1,000,000 to $5,000,000 est. value
CO

Design-Build of "Eastside" Distribution Substation
Term Contract
Construction
Fountain, CO 80817

Rattlesnake Solar - Hudson
New Construction
Construction
Hudson, CO

Shunt Reactor for Hayden Substation
Term Contract
Post-Bid
Hayden, CO

Cardnell Substation Construction - Installation
Results
Glenwood Springs, CO 81601

CMAFS Substation
Renovation
Post-Bid
Colorado Springs, CO 80926

Horseshoe Electrical Substation Improvement Project
Results
Loveland, CO 80537

Transformer T3 Replacement Timberline Substation
Renovation
Post-Bid
Fort Collins, CO

Horseshoe Electric Substation Improvement
Results
Loveland, CO 80537

Poncha Substation Stage 04
Results
$500,000 to $1,000,000 est. value
Poncha Springs, CO

Sep Briargate Substation Control Enclosure
New Construction
Results
CO

Reported 01/07/2022 12:00 AM
Project Title

SEP Horizon Three Phase Variable Shunt Reactor

Physical Address View project details and contacts
City, State (County) Colorado Springs, CO   (El Paso County)
Category(s) Industrial/Manufacturing
Sub-Category(s) Electric Substation
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Bids is is soliciting a Shunt Reactor (Contractor) to provide a Three Phase Variable Shunt Reactor for the Horizon Substation. The scope for this solicitation includes the Shunt Reactor, factory design, mechanical/structural and electrical approval drawings, fabrication, miscellaneous materials, factory testing and delivery.

Details

Electric Substation, New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Substations, Power Distribution Units, Transfer Switches.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents