Similar Projects
Last Updated | 03/31/2022 04:47 PM |
Project Title | College Heights Detention Pond Rehabilitation |
Physical Address | View project details and contacts |
City, State (County) | LA (Calcasieu County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Shoreline/Erosion/Drainage |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The general scope of work is the restoration of the existing storm water detention pond serving College Heights Subdivision Phase One to its original volume. The scope includes clearing of the vegetation, removal of the siltation to plan grade, reshaping of the side slopes, placement of an erosion control blanket along the side slopes, concrete block erosion control mat, and placement of a vinyl retaining wall along the East side of Lots 28 and 56 College Heights Sub Phase 1, and hydroseeding. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |