Similar Projects
Hurricane and Storm Damage Risk Reduction
Term Contract
Design
$5,000,000 to $10,000,000 est. value

2022 Drainage Improvements
Infrastructure
Bidding
Westlake, LA

Water oak Drainage
Alteration
Bidding
$17,140 est. value

New Offices And Shop For Cameron Parish Drainage District #7
Infrastructure
Post-Bid
$900,000 est. value
Sulphur, LA

Wastewater Treatment Plant Oxidation Pond Repairs
Renovation, Infrastructure
Post-Bid
Iowa, LA

LA 378 - Up Rr Crossing (Westlake)
Infrastructure
Results
$250,000 to $500,000 est. value
Westlake, LA 70669

Aluminum Pipe
Infrastructure
Results
Lake Charles, LA

Louisiana Avenue South of Mcneese Drainage Improvements
Infrastructure
Post-Bid
Lake Charles, LA

Drainage Improvements Of The Miller Ditch Md-L51 (Pine Pasture Road To Jeff Davis Parish) In Ward 2
Infrastructure
Results
Lake Charles, LA

Program Management of the Critical Drainage Improvement
Infrastructure
Results
Lake Charles, LA

Burton Dorm Flood Repairs
Infrastructure
Results
$10,000 est. value
Lake Charles, LA

West Shore Lake Pontchartrain, Bottomland Hardwood, Louisiana Project, CEMVN
Term Contract
Results
$10,000,000 est. value

Oak Park Lateral Drainage Improvements
Infrastructure
Results
Lake Charles, LA

West Oak Lane Drainage
Infrastructure
Results
Lake Charles, LA

St. Louis Area Drainage Rehabilitation
Infrastructure
Results
Lake Charles, LA

Last Updated 03/31/2022 04:47 PM
Project Title

College Heights Detention Pond Rehabilitation

Physical Address View project details and contacts
City, State (County) LA   (Calcasieu County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The general scope of work is the restoration of the existing storm water detention pond serving College Heights Subdivision Phase One to its original volume. The scope includes clearing of the vegetation, removal of the siltation to plan grade, reshaping of the side slopes, placement of an erosion control blanket along the side slopes, concrete block erosion control mat, and placement of a vinyl retaining wall along the East side of Lots 28 and 56 College Heights Sub Phase 1, and hydroseeding.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents