Similar Projects
O'Reilly Auto Parts (CGE) / Carthage
New Construction, Infrastructure
Conception
$400,000 CJ est. value
Carthage, NC 28327

Village Walk
New Construction, Infrastructure
Design
$12,100,000 CJ est. value
Southern Pines, NC 28387

Village Walk
New Construction, Infrastructure
Design
$12,100,000 CJ est. value
Southern Pines, NC 28387

Influent Pump Station Upgrade
Infrastructure
Bidding
$700,000 CJ est. value
Aberdeen, NC 28315

Habitat for Humanity NCSH - SHOP 2021 Project - Addor Rd Development Subdivision
Infrastructure
Bidding
$2,000,000 CJ est. value
Pinebluff, NC 28373

Phase 2 Sewer Extension Project
Infrastructure
Post-Bid
$7,000,000 CJ est. value
Vass, NC 28394

2021 Urgent Repair Program - Housing Rehabilitation
Renovation
Post-Bid
$30,000 est. value
Carthage, NC

Replacement of Bridge No.119 over Wads Creek on SR 1251 (Brinkley Road)
Demolition, New Construction, Infrastructure
Results
$1,059,233 CJ est. value
Carthage, NC 28327

Landscape Planting and Enhancement
Infrastructure
Results
$81,229 CJ est. value
Aberdeen, NC 28315

BHAWK
New Construction, Infrastructure - 45,037 SF
Construction
$10,800,000 CJ est. value
Southern Pines, NC 28387

Morganton Park South - Pine Ridge Parkway
Infrastructure
Construction
$500,000 CJ est. value
Southern Pines, NC 28387

Blake Village Mixed-Use Development
New Construction, Infrastructure - 945,000 SF
Pending Verification
$70,000,000 CJ est. value
Aberdeen, NC 28315

Blake Village Mixed-Use Development
New Construction, Infrastructure - 945,000 SF
Pending Verification
$70,000,000 CJ est. value
Aberdeen, NC 28315

Morganton Park North Phase 9
New Construction, Infrastructure - 20,000 SF
Design
$118,400,000 CJ est. value
Southern Pines, NC 28387

Whispering Pines Park
Infrastructure
Post-Bid
$1,000,000 CJ est. value
Whispering Pines, NC 28327

Last Updated 09/18/2023 10:11 AM
Project Title

Murray Hill Pines Multi-Family

Physical Address View project details and contacts
City, State (County) Southern Pines, NC 28387   (Moore County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Multi-Family Homes, Single-Family Homes, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $56,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

149 residential single-family and duplex rental units, clubhouse, pool, dog park, playground. As of September 18, 2023, site plans are under review with the city of Southern Pines. Information regarding a general contractor or selection has not been provided. A timeline for construction has not been announced. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents