Similar Projects
SR 20/Eagle Vista Dr to Ault Field Rd Vic - ADA Compliance
Infrastructure
Design
$609,000 CJ est. value
Oak Harbor, WA 98277

SR 20/Eagle Vista Dr to Ault Field Rd Vic - ADA Compliance
Infrastructure
Design
$609,000 CJ est. value
Oak Harbor, WA 98277

SR 525 - Clinton Ferry Terminal Vicinity Pedestrian Connectivity
Infrastructure
Bidding
$1,000,000 CJ est. value
Coupeville, WA 98239

SR 525 - Clinton Ferry Terminal Vicinity Pedestrian Connectivity
Infrastructure
Bidding
$1,000,000 CJ est. value
Coupeville, WA 98239

Fakkema Access Road
Infrastructure
Post-Bid
$650,000 to $850,000 est. value
Oak Harbor, WA 98277

Tower Site Readiness Phase II Project
Infrastructure
Post-Bid
Camano Island, Darrington, Everett, Kingston, Marysville, Mountlake Terrace, WA 98208

Pacific Avenue Safety - Midblock Crossing
Alteration
Results
$620,574 est. value

2022 to 2023 Unit Price Directional Boring Contract
Term Contract
Results
$2,000,000 est. value
Camano Island, WA

RFP D/B - East Camano Drive/ Cross Island Road Intersection Improvements
Infrastructure
Bidding
$200,000 CJ est. value
Camano Island, WA 98282

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

2022 Western Region Pavement Preservation MATOC
Alteration
Results
$300,000 to $10,000,000 est. value

O' Reilly Auto Parts / Freeland
New Construction, Infrastructure - 7,365 SF
Bidding
$1,000,000 CJ est. value
Freeland, WA 98249

Hoypus Point Restoration
Infrastructure
Post-Bid
$200,000 to $240,000 est. value
Oak Harbor, WA

Ls Resurfacing 1
Term Contract
Results
$997,219,550 est. value

I-405, NE 85th Street Interchange and Inline BRT Station Project
Infrastructure
Post-Bid
$210,000,000 CJ est. value
Kirkland, WA 98033

Last Updated 11/10/2022 01:36 AM
Project Title

SR 20/Boon Rd Vic to Eagle Vista Dr Vic - Paving

Physical Address View project details and contacts
City, State (County) Coupeville, WA 98239   (Island County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected March 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $1,241,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Resurfaces deteriorating asphalt pavement (due to rutting, cracking, and normal wear) with an asphalt overlay. Extends the service life of the existing pavement. As of November 10, 2022, this project is in Final Planning status. Preliminary engineering has begun and environmental design is expected to be complete in the Fourth quarter of 2022. The contract advertisement is expected in first quarter of 2023 and construction is anticipated to be operationally complete in the Fourth quarter of 2023. WSDOT - SR 20/Boon Rd Vic to Eagle Vista Dr Vic - Paving *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents