Similar Projects
Sawmill Mixed Use Future Phases
New Construction, Infrastructure
Conception
$200,000,000 CJ est. value
Summerville, SC 29483

Sawmill Mixed Use Future Phases
New Construction, Infrastructure
Conception
$200,000,000 CJ est. value
Summerville, SC 29483

Downtown Nexton Mixed-Use
New Construction, Infrastructure - 310,000 SF
Design
$100,000,000 CJ est. value
Summerville, SC 29483

SafeNest Storage
New Construction, Infrastructure - 113,400 SF
Design
$12,200,000 CJ est. value
Summerville, SC 29483

Intersection Improvement US 176 (State Rd)/S-135 (Mudville Rd)
Infrastructure
Bidding
$2,100,000 CJ est. value
Summerville, SC 29483

Intersection Improvement US 176 (State Rd)/S-135 (Mudville Rd)
Infrastructure
Bidding
$2,100,000 CJ est. value
Summerville, SC 29483

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Harris Teeter Fuel Center #355 / Summerville
Demolition, New Construction, Infrastructure, Renovation
Post-Bid
$800,000 CJ est. value
Summerville, SC 29485

Paving Solicitor's and Sheriff's Parking Lot
Alteration
Results
Saint George, SC 29477

Rehabilitation - S-174 Dorchester Co
Infrastructure
Results
SC

The Ponds - Phase 6
New Construction, Infrastructure
Construction
$66,000,000 CJ est. value
Summerville, SC 29483

BID Group Wood Processing Expansion
Addition, Demolition, Infrastructure
Pending Verification
$10,600,000 CJ est. value
Saint George, SC 29477

Limehouse Drive/Multi-Residential
New Construction, Infrastructure
Pending Verification
$18,000,000 CJ est. value
Summerville, SC 29485

Intersection Improvement S-169 (Von Ohsen Rd)/S-881 (Lincolnville Rd)
Infrastructure
Conception
$2,100,000 CJ est. value
Summerville, SC 29485

Rangewater North Maple Street
New Construction, Infrastructure
Design
$65,000,000 CJ est. value
Summerville, SC 29483

Last Updated 01/06/2023 11:37 AM
Project Title

Preservation - I-26 (Dorchester County)

Physical Address View project details and contacts
City, State (County) Harleyville, SC 29448   (Dorchester County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $4,496,500 [brand] Estimate
Plans Available from Civil Engineer - 07/12/22
Owner View project details and contacts
Architect View project details and contacts
Description

As of September 16, 2022, the project has been awarded. A timeline for construction has not been confirmed. SC File NO(S).: 1861381 PCN: P040972 Project No.: P040972 Approx. Length (miles): 9.7100 CO(S).: Dorchester The Contractor's attention is called to the requirements of the SC Department of Transportation for Prequalification. Only contractors who have been issued a prequalification certificate by the sc department of transportation will be allowed to submit bids. Information concerning prequalification can be obtained at the Contracts Administration office, Room 332 in the Headquarters building, 955 Park Street, Columbia, SC, or by contacting Maria Devito at (803)737-2043 or Prequal@scdot.org. Unless otherwise indicated in the advertisement, no proposal will be considered unless accompanied by a bid bond in the amount of 5% of the Approximate bid amount, written by a surety satisfactory to the Department, properly executed in South Carolina Department of Transportation Form 674 (furnished by the Department in each proposal). If an electronic bond is utilized, the Bond ID number must be provided on the Surety 2000 or SurePath Network electronic bond form. No other form of proposal guaranty will be accepted. Visitors are welcome and should sign in at the Park Street entrance. Please contact the Contract Administration Office at (803)737-1249 with all Letting related questions. The south carolina department of transportation reserves the right to reject any or all proposals and waive any technicalities. SCDOT - 040 - Preservation - I-26 (Dorchester Co) *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents