Similar Projects
New Industrial Park Streets
Post-Bid
Dieterich, IL

2021 Thermoplastic Lane Marking Material & Labor
Term Contract
Post-Bid

7.2 Miles of Milling and Resurfacing on Montrose Blacktop From Il 121 to the Effingham County Line Near Montrose
Results
Montrose, IL

7.9 Miles of Milling and Resurfacing
Results
IL

Bituminous Material
Post-Bid
Effingham, IL

2 Miles of Crack and Joint Sealing on I-57/70 from the Little Wabash River to Us 40 and 2.75 Miles on i-57/70 from 4th Street Overpass to the North Tri- Level Including Exit and Entrance Ramps
Results
IL

Seal Coat
Infrastructure
Post-Bid
Effingham, IL

1.56 Miles of Partial Depth Resurfacing at Various Locations on US 40, IL 32 and IL 33
Results

Road Construction of Heritage Avenue Extension
Infrastructure
Post-Bid
$200,000 est. value
Effingham, IL 62401

Four Seasons Reconstruction
Results
Less than $142,221 est. value
Effingham, IL

2022 Hot and Cold Mix Program
Infrastructure
Post-Bid
$500,000 est. value
Effingham, IL

2021 Temple Avenue Resurfacing
Results
Less than $430,777 est. value
Effingham, IL 62401

2021 Street Resurfacing Program Phase 1
Results
Less than $559,854 est. value
Effingham, IL

2021 Pavement Preservation
Results
Less than $461,324 est. value
Effingham, IL

2021 Crack and Joint Sealing Program
Results
Less than $30,000 est. value
Effingham, IL

Last Updated 06/22/2022 04:24 AM
Project Title

1.3 Miles of Patching on IL 37 From Eastwood Street to 700th Avenue in Watson and 0.9 Miles of Patching on the Connector Road Between and I-57 and IL 37

Physical Address View project details and contacts
City, State (County) IL   (Effingham County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1.3 miles of patching on IL 37 from Eastwood Street to 700th Avenue in Watson and 0.9 miles of patching on the connector road between and I-57 and IL 37 in Edgewood 44200050 Sq Yd Welded Wire Reinforcement Base Items 203.000 44200970 Sq Yd Class B Patches, Type Ii, 10 Inch Base Items 246.000 44200974 Sq Yd Class B Patches, Type Iii, 10 Inch Base Items 76.000 44200976 Sq Yd Class B Patches, Type Iv, 10 Inch Base Items 127.000 44201299 Each Dowel Bars 1 1/2" Base Items 660.000 44201815 Sq Yd Class D Patches, Type Ii, 14 Inch Base Items 54.000 44201819 Sq Yd Class D Patches, Type Iii, 14 Inch Base Items 16.000 44201821 Sq Yd Class D Patches, Type Iv, 14 Inch Base Items 380.000 44213200 Foot Saw Cuts Base Items 1,910.000 44213204 Each Tie Bars 3/4" Base Items 45.000 67100100 L Sum Mobilization Base Items 1.000 70100450 L Sum Traffic Control and Protection, Standard 701201 Base Items 1.000 70102620 L Sum Traffic Control and Protection, Standard 701501 Base Items 1.000 70107025 Cal Da Changeable Message Sign Base Items 56.000

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents