Similar Projects
Social Science Replace Air Handler and Reroof
Alteration
Bidding
$543,194 est. value
Reedley, CA 93654

Hood and Duct Cleaning Services
Term Contract
Bidding
Avenal, Blythe, Chowchilla, Coalinga, Corcoran, CA 93204

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

AHU Replacement Fresno Armory
Alteration
Results
$350,000 est. value
Fresno, CA 93727

HVAC Services
Alteration
Results
Oroville, San Joaquin, San Luis Obispo, CA

JE Young High School HVAC Replacement
Alteration
Bidding
$150,000 est. value
Fresno, CA 93701

Energy Management System Upgrade - Various Sites
Alteration
Post-Bid
Clovis, CA

Ahwahnee Middle School Locker Room Heating Replacement
Renovation, Alteration
Results
$200,000 est. value
Fresno, CA 93710

Theater Arts HVAC Upgrades
Alteration
Bidding
$1,750,000 est. value
Fresno, CA 93704

CHP Central Division Area office - HVAC Maintenance Services
Alteration
Post-Bid
Fresno, CA 93722

Edison High School Multipurpose Room HVAC Replacement
Alteration
Results
$200,000 est. value
Fresno, CA 93706

Repair Chillers
Infrastructure
Post-Bid
Mendota, CA

Hoover High School Gym, Locker Room, and Music Building HVAC Equipment Replacements
Alteration
Results
$880,000 est. value
Fresno, CA 93722

SJH Facilities Maintenance Electrical and HVAC
Term Contract
Post-Bid
Friant, CA

Reported 06/17/2022 12:00 AM
Project Title

Administration Building HVAC, MCC

Physical Address View project details and contacts
City, State (County) Fresno, CA 93721   (Fresno County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $180,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Project includes replacement of existing Air Handler Chilled and Hot Water Coils with New Variable Refrigerant Volume DX coils with matching VRV Heat Pump Unit. Complete with all equipment, piping, controllers, controls, wiring, cabling, etc. Communicate with existing BACnet Communicating DDC Controls System. Provide full Air Balancing, Start-Up, and Commissioning of systems. Provide all electrical power and control wiring, conduit, and accessories. Provide concrete housekeeping pad for outdoor heat pump unit and anchor all equipment and accessories in place.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents