Similar Projects
Last Updated | 04/06/2022 03:56 PM |
Project Title | Renovate Basement, Building 1 |
Physical Address | View project details and contacts |
City, State (County) | Fort Wayne, IN 46805 (Allen County) |
Category(s) | Government/Public |
Sub-Category(s) | Misc. Buildings |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | STATEMENT OF WORK Renovate Basement, Building 1 VHA Northern Indiana Health Care System Ft. Wayne, IN Project: 610A4-19-104 Solicitation will be posted to beta.SAM.gov on or around March 11, 2021 Project Background: The basement has not been renovated for decades, if at all, and is being renovated in this project to modernize the space. Statement of Work: Contractor will provide all labor, equipment, materials, and supervision necessary to Renovate Basement, building 1 at the Ft. Wayne campus of the VHA Northern Indiana Health Care System to include but not limited to the following: Renovate space in the basement for Environmental Management Services, Biomed, Pharmacy, Mailroom, Engineering Services, Office of Information and Technology, Graduate Medical Education, and Medical Imaging by following the developed design and specifications. Campus buildings are pre-1950 construction; asbestos containing material and lead based paint are present in the buildings and must be removed and handled per OSHA guidelines. VA shall provide most recent surveys of hazardous material. The design identifies hazardous locations and materials as applicable to complete the project. The project is divided in three phases per the A/E s drawings. As a working Hospital the adjacent spaces and functions will need to be maintained and a high degree of coordination, scheduling and phasing will be required to allow the continuation of the existing Hospital Services during the entire Construction Project. Each phase must have a punch list and a 30-day work stoppage between phases at no additional cost to the government to allow for internal moves. |
||||||||||||||||||||||||||||||||
Details | Misc. Buildings, Renovation.
|
||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |