Similar Projects
Pre-Cast Concrete Grade Crossings
Post-Bid
$100,000 est. value
Pittsburgh, PA 15234

Concrete Maintenance
Post-Bid
Pittsburgh, PA 15219

NSG and WGRSG 2020 Concrete and Joint Repairs
Results
Less than $1,000,000 est. value
Pittsburgh, PA

North Shore Riverfront Park Concrete Repairs
Results
Less than $225,000 est. value
Pittsburgh, PA 15222

Concrete, Brick, Blockstone Repair/Replace/Renovate
Term Contract
Post-Bid
Pittsburgh, PA

Crack and Joint Sealing Materials
Term Contract
Results

Precast Concrete Inlets and Risers
Post-Bid
Carnegie, PA

Installation of Concrete Pad and Walkway at Kane Scott
Results
Pittsburgh, PA 15243

Various Asphalt and Concrete Repairs at the Crescent Early Childhood Center
Post-Bid
Pittsburgh, PA 15213

North Shore Riverfront Park (NSRFP) Tribute to Children (TTC) Masonry and Concrete Repairs
Results
Pittsburgh, PA 15212

Precast Concrete Curbs
Term Contract
Post-Bid
Pittsburgh, PA

Exhibit Hall Alcove Composite Slab Repairs
Results
$250,000 est. value
Pittsburgh, PA 15222

Foundations & Slab-On-Grade Bid Package at Pittsburgh International Airport
Post-Bid
Pittsburgh, PA 15233

Main Street Streetscape - Electrical/Concrete
Alteration
Results
$450,000 est. value
PA

Saw Mill Run Maintenance Project
Infrastructure
Post-Bid
Pittsburgh, PA

Last Updated 01/13/2022 02:32 AM
Project Title

Concrete Repairs at South Park Wave Pool III

Physical Address View project details and contacts
City, State (County) Bethel Park, PA 15102   (Allegheny County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Saw cutting and removing spalled concrete at South Park Wave Pool. All concrete to be removed off-site by the contractor. Contractor will provide basic slurry cleanup with shop vac or squeegee in immediate work area. All water stop to be left in place. Back-filling and pouring to be done by county forces. Contractor responsible for field verifying all lineal footage for saw cuts at joints Contractor responsible for field verifying all dimensions for demolition of concrete pads Contractor responsible to remove all spoils / debris from site and submit landfill receipts to Allegheny County The Contractor is responsible for protection of all surfaces adjacent to the demolition work. The manner of protection shall be approved by Allegheny County. The Contractor shall notify the County of any existing previously unknown conditions contrary to what is shown on drawings prior to starting work. The Contractor shall be responsible for all repairs and patching of over breakage and any such repairs shall match existing adjacent surfaces.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Concrete Cutting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents