Similar Projects
Sunland Park Levee Rehabilitation
Term Contract
Design
El Paso, TX

Lucero Center Pool Drainage System
Infrastructure
Bidding
Espanola, NM

Construction of the Country Club Drive - St. Andrews Way Infrastructure and Roadway Improvements
Infrastructure
Bidding
Angel Fire, NM 87710

Mirabal Park Multipurpose Flood Control Facility
Post-Bid
Milan, NM 87021

On Call Construction Services for Public Works
Term Contract
Post-Bid
Less than $2,500,000 est. value
Los Alamos, NM 87544

Drainage and Roadway Improvements Ridge Road - Phase 1
Results
Silver City, NM 88061

Upper Bosque De Bernalillo Flood Mitigation Project
Results
$489,300 est. value
Albuquerque, NM 87124

Repair Bonito Campground Access Roads
Infrastructure
Bidding
$500,000 est. value
Nogal, NM 88341

Phase I of the Miami Lake Restoration Project
Post-Bid
Truth or Consequences, NM 87901

2018 Colonias Roadway & Drainage Improvements Foster Drive NMFA Colonias Stantec Project
Results
$542,820 est. value
Reserve, NM 87830

NM 124 Road Diet
Infrastructure
Bidding
Laguna, NM

Jemez River Flume Reconstruction Project
Post-Bid
Zia Pueblo, NM 87053

2019 CDBG - Street, Drainage Improvements
Results
$802,963 est. value
Jal, NM 88252

Elk Trail and Black Bear Road - Culvert Replacement
Infrastructure
Bidding
Jemez Springs, NM 87025

Turley-Manzanares Acequia Rehabilitation Project Phase 2
Post-Bid
NM

Last Updated 02/02/2022 05:41 PM
Project Title

Lower Montoyas Arroyo Bank Stabilization Project

Physical Address View project details and contacts
City, State (County) NM   (Sandoval County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work under this section includes compliance with the U.S. Environmental Protection Agency (EPA), National Pollutant Discharge Elimination System (NPDES) Regulations for Storm Water Discharges from construction sites. A Storm Water Pollution Prevention Plan (SWPPP). This work consists of developing and maintaining this plan to control erosion, pollution, sediment and runoff during the construction of the project.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents