Similar Projects
Metro Center - Master Plan
New Construction
Design
Aurora, CO 80012

Metro Center - Parcel A
New Construction
Design
Aurora, CO 80012

I-70 Picadilly Design Build
Infrastructure
Bidding
Aurora, CO 80040

Scour Mitigation for Two Twin Structures
Infrastructure
Bidding
$5,000,000 CJ est. value
Aurora, CO 80019

Asphalt Repair FCI Englewood
Term Contract
Post-Bid
Littleton, CO

2021 Roadway Improvements Project
Infrastructure
Post-Bid
Bow Mar, CO

On-Site Improvements
Results
Greenwood Village, CO 80111

Greenwood Gulch Undercrossing Improvements
Results
Greenwood Village, CO

Legacy at Metro Center
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Aurora, CO 80011

Centennial Medical Plaza
New Construction, Renovation, Infrastructure - 61,000 SF
Pending Verification
$7,000,000 CJ est. value
Centennial, CO 80112

Metro Center - Parcel B
New Construction
Design
Aurora, CO 80017

High Line Canal Trail Improvements - Colfax Avenue to I70
Infrastructure
Bidding
$300,000 est. value
Aurora, CO 80040

Construction Debris, Solid Waste
Infrastructure
Post-Bid
Littleton, CO

Greenwood Gulch Undercrossing
Results
$250,000 to $350,000 est. value
Centennial, CO 80111

Windler Mixed-Use Development / Aurora
New Construction, Infrastructure
Pending Verification
$287,000,000 CJ est. value
Aurora, CO 80011

Last Updated 08/09/2022 04:06 PM
Project Title

Aurora Police District 2 Sidewalk Installation

Physical Address View project details and contacts
City, State (County) Aurora, CO 80011   (Arapahoe County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $600,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Aurora Police District 2 Sidewalk Installation project will consist of concrete work to be performed. The intent of the project is to add a sidewalk with steps and a motorcycle pad. Currently the area along the east side of the building is gravel and is a walking hazard for pedestrians. General Requirements - Bid Deposit Required - Insurance Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 % Question Acceptance Deadline 07/25/2022 05:00 PM EDT Questions are submitted online No Each Bid shall be accompanied by an appropriate guarantee in the form of a Bid Bond, Certified Check or Cashier's Check made payable to the City of Aurora in an amount of not less than five percent (5%) of the amount of the Bid. Original bid bonds do not have to be mailed; however, each bidder should maintain the original on file should the City request it at a later time. Bidders needing assistance with registration or the bid uploading process may contact portal at 1-800-835-4603 or e-mail at procurementsupport@bidnet.com. To ensure bidders have a clear understanding of the project scope, specifications, and contractual requirements, an OPTIONAL Pre-Bid Conference is scheduled Attendance is not required, but highly recommended. This will be an online/virtual event held using Microsoft Teams. Interested parties may joint the meeting

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents