Similar Projects
Z2DZ--Renovate and Replace Pharmacy AHUs
Design
$1,000,000 to $5,000,000 est. value
Durham, NC 27705

Ronald Wilson Reagan High School HVAC Replacement
Design
Pfafftown, NC 27040

Goraleigh Chiller
Bidding
Raleigh, NC

Union West Regional Library Ceiling
Bidding
Indian Trail, NC 28079

HVAC Replacements
Post-Bid
Salisbury, NC

20 Ton Air-Cooled Chiller
Post-Bid
Greensboro, NC 27412

Frank Porter Graham Elementary School - Intermediate & Media Buildings Hvac Replacement
Results
Chapel Hill, NC

HVAC Maintenance Contract
Term Contract
Results
Less than $713,590 est. value
Dunn, Erwin, Lillington, Spring Lake, NC 27546

Replacement and Installation of a 10 Ton HVAC Split System
Bidding
Granite Quarry, NC 28146

PC Air Units
Post-Bid
Charlotte, NC 28208

HVAC Repairs Rachel Freeman School of Engineering
Results
Less than $93,657 est. value
Wilmington, NC 28405

HVAC Maintenance and Water Treatment Service
Term Contract
Bidding
Lumberton, NC 28360

Durham City Hall HVAC and Electrical Renovations
Post-Bid
Durham, NC

HVAC Contractors
Results
Kinston, NC

Design Build - Indoor Pool Dehumidification System
Post-Bid
Waynesville, NC 28786

Reported 02/27/2021 12:00 AM
Project Title

Business Services HVAC Replacement Project

Physical Address View project details and contacts
City, State (County) Rocky Mount, NC 27804   (Nash County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Goal: 10% The work associated with the project primarily includes replacing the failed multi-zone air handling unit in the penthouse serving the second floor of the building. The new air handling unit shall be connected to the building’s existing heating hot water system for heating and shall be provided with a new air-cooled condenser for cooling. Removal and replacement of a select portion of the existing single-ply EPDM membrane roofing system as required for installation of new roof curbs supporting the air-cooled condenser is included in the scope of the work. The building’s existing DDC system is antiquated, and a new stand-alone system shall be provided as part of the project to control the new air handling unit and allow for future expansion and flexibility. All demolished and new equipment shall be required to exit and enter the third-floor penthouse through the existing 6’-0” wide x 7’-0” double doors located on the roof.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents