Similar Projects
Maintenance Roadway Contract C216,
Infrastructure
Bidding
$10,000,001 to $20,000,000 est. value

2020 Road Program
Post-Bid
Hampton, NJ 08827

Bellis Road Phase III Roadway Improvement Project
Post-Bid
Milford, NJ 08848

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Route 78, Rockfall Mitigation
Results
$20,000,001 to $50,000,000 est. value
NJ

Runway 4-22 Rehabilitation Project
Term Contract
Construction
$1,800,000 est. value
Whitehouse Station, NJ 08889

Mount Joy Road Improvement Project
Post-Bid
Milford, NJ 08848

Roadway Reclamation (FDR) of Manchester Road
Results
Flemington, NJ 08822

Harrison Street and Second Street Improvement
Post-Bid
Frenchtown, NJ 08825

Resurfacing of Various County Roads and Parks In Various Townships
Results
Flemington, NJ 08822

Roadway Improvement Project for Hart Boulevard
Post-Bid
Flemington, NJ 08822

Roadway Resurfacing Milepost 83 to 122 Section 19 and 20
Results
$20,000,000 to $40,000,000 est. value

2020 CDBG Road Reconstruction Program
Post-Bid
Old Bridge, NJ

Washington Avenue Improvement Project Section III and River Road Improvement Project Section I
Results
$332,758 est. value
High Bridge, NJ 08829

Road Improvements Project - George`s Place
Post-Bid
Clinton, NJ

Last Updated 02/10/2022 11:07 AM
Project Title

Downtown Streets Improvement Project

Physical Address View project details and contacts
City, State (County) Frenchtown, NJ 08825   (Hunterdon County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project improvements are proposed along Front Street, Lott Street and South Harrison Street. The Project consists of removing and replacing select areas of curb and sidewalk, roadway pavement repairs, select drainage improvements, the milling of the roadway surface and the installation of 2" of HMA surface course, as well as, site restoration. The Borough intends to commence construction in the Spring of 2022.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents