Similar Projects
Career, Technical and Manufacturing Center
New Construction - 52,300 SF
Design
Less than $21,850,200 est. value
Crystal Lake, IL 60012

Expressway Mowing North
Post-Bid

Expressway Mowing North
Post-Bid

ADA Improvement Project along Various State Maintained Routes
Results
Fox Lake, Grayslake, Lake Villa, Richmond, Winthrop Harbor, IL

Ada Improvements on IL 171 from 19th St to Maryknoll Dr in the City of Lockport in Will
Results
Barrington, Lockport, Wauconda, IL

Landscape Maintenance Services
Term Contract
Post-Bid
Cary, IL

2021 Parking Lot Replacements
Results
Lake in the Hills, IL

Statewide Natural Areas Management
Term Contract
Post-Bid

Roadway Resurfacing
Results
Less than $5,153,802 est. value
Woodstock, IL

100 Tree Planting
Post-Bid
Crystal Lake, IL

Parking Lot Sealcoating
Term Contract
Results
Algonquin, IL

The Knoxville United Methodist Church Lawn Care
Post-Bid
Knoxville, IL 61448

2021 Parking Lot Maintenance
Results
Woodstock, IL 60098

2021 MCC Interior
Renovation
Post-Bid
Less than $925,000 est. value
Crystal Lake, IL 60012

Bike Path from East of Illinois Route 31 into the Park
Results
Cary, IL

Last Updated 04/19/2022 01:07 PM
Project Title

Expansion of Center for Agrarian Learning Student Farm - Landscaping Services

Physical Address View project details and contacts
City, State (County) Crystal Lake, IL 60012   (McHenry County)
Category(s) Education, Heavy and Highway
Sub-Category(s) College/University, Landscaping, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will consist of beautifying the area with various plantings, installation of planter boxes, and expanding the water service to include two new spigots. The project also calls for the installation of a formal entry point that will lead from a future parking lot to be installed in another project at a later time. The entry way includes a trellis, seating, and gathering area. A prepared surface space for a tent will also be included as will space for plants and/or flower beds. TIME OF COMPLETION: Substantial completion of the project will be November 30, 2021 for hardscaping and ground work, but this date can be negotiated with the Owner based on lead times for supplies, weather, and for survivability of plantings.

Details

Division 22 - Plumbing.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents