Similar Projects
Last Updated | 03/11/2021 04:57 AM |
Project Title | Concrete/Asphalt/Bridge Deck Joint Repairs and Roadways, Crack Sealing, Asphalt Milling and Foam Injections |
Physical Address | View project details and contacts |
City, State (County) | (Davidson, Davie, Forsyth, Rowan, Stokes Counties) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 1 Sp Mobilization 5 Ea 2 Sp Concrete/Asphalt Repair Fibrecrete b 15,000 Lb 3 Sp Concrete/Asphalt Repair Fibrecrete g 10,000 Lb 4 Sp Crack Sealing (Without Router Or Diamond Saw) 2,500 Lb 5 Sp Crack Sealing (With Router Or Diamond Saw) 2,500 Lb 6 Sp Milling Asphalt Pavement 2 Day 7 Sp Foam Installation - Hdpf Slab Leveling, Undersealing And Voidfilling 1,000 Lb 8 Sp Foam Installation - Soil Stablization 250 Gal 9 Sp Silicon Joint Replacement 1,000 Lf 10 Sp Evazote Joint Replacement 1,500 Lf 11 Sp Saw Cutting For Evazote Expansion Joints 1,000 Lf 12 Sp Open Joint Evazote Placement 500 Lf 13 Sp Asphalt Joint Repair/Replacement (18" - 24"Wide, With Plate 150 Cf 14 Sp Joint Repair Using Elastomeric Concrete (16" Wide Or Less And 2" Deep Or Less) 750 Lf 15 Sp Joint Repair Using Elastomeric Concrete (Greater Than 16" Wide Or Greater Than 2" Deep) 200 Cf 16 Sp Dewatering And Cleaning 5 Day 17 Sp Repairs To Corrugated Metal Pipes 1,000 Sf 18 Sp Sealing Pipe Joints 500 Lf 19 Sp Backgrouting/Void Filling At Pipe Joints 800 Gal 20 Sp Placement Of Elastomeric Spray-On Coating 500 Sf 21 Sp Temporary Lane Closure (2-Lane, 2-Way Roadway) 10 Ea 22 Sp Temporary Lane Closure (Multi-Lane Roadway) 10 Ea 23 Sp Lane Closure Shift (Multi-Lane Roadway) 2 Ea 24 Sp Nighttime Temporary Lane Closure (2-Lane, 2-Way Roadway) 2 Ea 25 Sp Nighttime Temporary Lane Closure (Multi-Lane Roadway) 10 Ea 26 Sp Nighttime Temporary Lane Shift (Multi-Lane Roadway) 2 Ea 27 Sp Shoulder Closure 5 Day |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |