Similar Projects
Tennis Center - Construction - Town of Flower Mound
Infrastructure
Conception
$12,250,000 CJ est. value
Flower Mound, TX 75022

New Elementary School No 44 - Frisco ISD Construction Services
New Construction, Infrastructure - 80,000 SF
Conception
$15,000,000 CJ est. value
Frisco, TX 75033

Peabody Hotel
New Construction, Infrastructure - 345,130 SF
Design
$98,000,000 CJ est. value
Roanoke, TX 76262

Remedial Repair Attoyac Bayou Site 21
Infrastructure
Design
$250,000 CJ est. value
Nacogdoches, TX 75961

Renovations to Four Middle Schools
Renovation
Post-Bid
$25,500,000 est. value
Carrollton, Dallas, Irving, TX 75007

Cambria Hotel Northlake Texas
New Construction, Infrastructure - 84,966 SF
Post-Bid
$31,100,000 CJ est. value
Northlake, TX 76262

Annual Requirements Contract for Directional Boring
Term Contract
Results
Arlington, TX

Earthwork Improvements to Serve the Ridge at Northlake, Phase 3
Infrastructure
Results
Northlake, TX

Murphy Express #8925 / Crossroads
New Construction, Infrastructure - 5,233 SF
Construction
$1,500,000 CJ est. value
Crossroads, TX 76227

The Clariden School Steam Building
New Construction
Construction
Southlake, TX 76092

Aloft / Lewisville
New Construction, Infrastructure
Pending Verification
$6,000,000 CJ est. value
Lewisville, TX 75067

Frisco Performing Arts Center and Related Facilities
New Construction, Infrastructure
Pending Verification
$11,000,000 CJ est. value
Frisco, TX 75034

Street : Cemetery Hill Road Improvements - City of Carrollton
Infrastructure
Conception
$2,800,000 CJ est. value
Carrollton, TX 75007

Mingo Apartments
New Construction, Infrastructure - 32,096 SF
Design
$6,400,000 CJ est. value
Denton, TX 76209

Northlake Entryway Monumentation
Infrastructure
Post-Bid
$400,000 CJ est. value
Northlake, TX 76247

Last Updated 06/22/2023 10:08 AM
Project Title

Northwest High School Additions and Renovations - Package 1

Physical Address View project details and contacts
City, State (County) Justin, TX 76247   (Denton County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Middle/Senior High School, Site Development
Contracting Method Competitive Bids
Project Status Construction Commenced, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $12,000,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

As of June 21, 2023, construction is underway, however, an exact timeline for construction has not been confirmed. *Construction Manager at Risk - North Star Builders Group Project No -P08-023, 316-20-23 (Revision 2) Building additions and renovations, including all mechanical, electrical, plumbing, and general construction work.

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents