Last Updated | 08/18/2022 03:13 PM |
Project Title | Water Heater Replacement at Essex Manor |
Physical Address | View project details and contacts |
City, State (County) | Reno, NV 89506 (Washoe County) |
Category(s) | Single Trades |
Sub-Category(s) | Plumbing |
Contracting Method | Competitive Bids |
Project Status | Construction start expected August 2022 |
Bids Due | View project details and contacts |
Estimated Value | $630,081 [brand] Estimate |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of August 4, 2022, this project has not yet been awarded. A timeline for award has not yet been established. APN: 082-295-05-06 & 082-392-27 Housing Authority of the City of Reno (RHA) will accept sealed proposals for Water Heater Replacement at Essex Manor in Reno, Nevada. 1. All removed materials will be legally disposed of off-site by the Contractor daily. 2. Remove one hundred (100) existing water heaters, including all strapping, clips, tanks, blankets, and the existing flue to the "B" vent. 3. Remove existing gas valves and flex supply lines. 4. Remove a portion of the existing 3/4" gas lines, including drip legs, as necessary for rerouting to the new water heaters and re-connection. 5. Remove a portion of the existing 3/4" water lines to re-route to the new water heaters. 6. Provide and install one hundred (100) new Rinnai RU130iN tankless water heaters or RHA approved equal, per the manufacturer's requirements, all local codes, ordinances, and the plans and specifications. 7. Provide and install new 3/4" gas main to the water heater units. Supply and install new gas valves, flex supply lines, and all parts and fittings necessary for a complete operational system. Contractor will provide manometer testing on all gas installations. 8. Contractor will re-connect all existing T & P lines or install new ones as necessary. 9. Contractor will provide and install a new PVC or CPVC condensate line from the water heater to the nearest waste line in the building crawl space. The condensate line will meet the manufacturer's requirements. 10. Contractor will seal all existing gas lines and water line penetrations with an RHA-approved sealant, Rinnai metal pass-thru plates, escutcheon, or an RHA-approved equal. 11. Contractor will set each unit to the manufacturer's recommended settings for altitude operation. 12. Contractor will check all water line connections, fittings, and joints for leaks. 13. Contractor will set each tankless water heater unit to 120 operating temperature and check the hot water at the kitchen sink faucet to verify. 14. Contractor will leave the mechanical room in a neat, clean condition. 15. Contractor will be responsible for obtaining any permits for the project. It is the Contractors' responsibility to verify fees with the City of Reno prior to bidding on the work. 16. Contractor will be responsible for providing drawings if required by the City of Reno for permitting Davis Bacon Wage Rate NV20220044 02/25/2022 Modification 2 applies for all workers employed for this project. Cost Estimate $650,000.00 Work to be completed in 120 consecutive calendar days. All requests for alternate materials and/or methods must be submitted to RHA for approval no later than twelve (12) business days prior to bid opening directly to developmentdpt@renoha.org Proposals for CF projects that exceed $25,000 will not be considered unless accompanied by cashiers/certified check or bid bond in the amount equal to %5 of the bid, made payable to the Housing Authority of the City of Reno. Payment and Performance bonds are required for all HUD projects that exceed $25,000. RHA reserves the right to reject any or all bids, to waive any irregularities or informalities in any bid or in the bidding, and to determine the low bidder. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |