Similar Projects
Sumner & Newsome High School Additions
New Construction, Addition
Conception
Lithia, Riverview, FL 33579

New High School
New Construction
Conception
$48,616,107 est. value
Tampa, FL

Carrollwood Day School Center for Innovation
New Construction - 42,605 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Tampa, FL 33613

Robinson HS Referendum Year 3
Renovation
Design
Tampa, FL 33616

PK-8 School UU
New Construction - 180,000 SF
Post-Bid
Apollo Beach, FL 33572

Freedom High School and Liberty Middle School
Renovation
Post-Bid
$13,200,000 est. value
Tampa, FL 33647

Disaster Recovery Services
Results

2020 Referendum (Year 3) Projects
Results
Tampa, FL 33647

Spoto High School Classroom Addition
Addition
Construction
$9,500,000 est. value
Riverview, FL 33578

Farnell Middle School Referendum Year 3 (Design)
Renovation
Construction
Tampa, FL 33626

Spoto High School Addition
Addition - 31,013 SF
Conception
$16,058,922 est. value
Riverview, FL 33569

Chamberlain HS Gymnasium, Field House & Sports Stadium Modifications
Renovation
Design
$5,200,000 est. value
Tampa, FL 33612

Alonso High School - Gymnasium & Stadium Turf Modifications
Renovation
Post-Bid
$1,371,294 est. value
Tampa, Tangelo Park, FL 33635

Continuing Service Contracts for Architectural Design and Construction Management Services
Term Contract
Results
Less than $4,000,000 est. value
Tampa, FL 33610

Middle School UU
New Construction
Construction
FL

Last Updated 02/04/2022 01:54 PM
Project Title

Chamberlain and Alonso High School - Gymnasium and Stadium Modifications

Physical Address View project details and contacts
City, State (County) Tampa, FL 33612   (Hillsborough County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $10,200,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Chamberlain High entails the design and construction of upgraded architectural finishes in the Gymnasium Building, repair/replacement of stadium bleachers, replacement of exterior basketball courts, installation of artificial turf on the football field and necessary architectural improvements to the players “Field House”. Alonso High entails the creation of a functional air conditioned vestibule for the Gymnasium Building, creation of a “field house/locker room” building and the installation of an artificial turf playing surface (with associated drainage improvements at and adjacent to the football field).

Details

Middle/Senior High School, Renovation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents