Similar Projects
MAC Lab Chiller Maintenance
Term Contract
Bidding
Saint Leonard, MD 20685

Calvert Hall HVAC and Electrical Upgrade
Alteration
Bidding
Saint Marys City, MD 20686

HVAC Maintenance and Service for SHA in Westminster and Satellite Locations
Post-Bid
Less than $50,000 est. value
Westminster, MD 21157

College Center Cooling Tower Replacement
Post-Bid
Cumberland, MD 21502

J.E. Proctor Building Chiller Replacement
Results
Bowie, MD 20715

On-Call Maintenance Services for Heating Ventilation and Air Conditioning (HVAC)
Results
$100,000 to $500,000 est. value
Hanover, MD 21076

Eastern Technical High School Air Conditioning Project
Post-Bid
Essex, MD 21221

Magnetic Bearing Chiller Preventative Maintenance and On-Call Services
Results
Bel Air, MD 21014

Oil Heater Replacement at Glen Burnie Maintenance Shop
Post-Bid
Less than $50,000 est. value
Glen Burnie, MD 21061

HVAC Upgrade at Edgewood Elementary School #67
Results
Baltimore, MD 21216

Cummings Building HVAC Systemic Renovations
Post-Bid
$2,000,000 to $3,000,000 est. value
Baltimore, MD 21202

Classroom Air Conditioning Upgrade at Mt. Royal Elementary/Middle School #66
Results
Baltimore, MD 21217

NMIC-1 Replace 4 Chillers and Controls/Install Chiller Catwalks Project, National Maritime Intelligence Center, Suitland, Maryland
Post-Bid
$10,000,000 to $25,000,000 est. value
Suitland, MD

Main Cable and Anchorage Dehumidification System Maintenance
Term Contract
Results
$1,000,001 to $2,500,001 est. value
Annapolis, MD 21409

MAC Lab Chiller Maintenance : Lot 1 / Round 1
Post-Bid
Saint Leonard, MD 20685

Last Updated 06/11/2021 09:01 AM
Project Title

17718 Virginia Avenue HVAC Replacement Phase 2

Physical Address View project details and contacts
City, State (County) Hagerstown, MD 21740   (Washington County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $100,001 to $500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

he project includes providing and installing four new HVAC systems (RTU Nos. 1, 3, 4 and 5) and includes the installation of air distribution duct work, equipment, thermostats, low voltage wiring, ceiling air diffusers, dampers, ceiling return grilles, ceiling transfer grilles, structure for support of roof-mounted equipment and for support of new roof openings, roof curbs and all associated roof repairs, demolition, insulation, cutting, patching, etc. as necessary to accommodate installation of the proposed rooftop units. Duct smoke detectors shall be provided in the main return air and exhaust air plenum of each new air conditioning system as required by local building and fire codes. Duct smoke detectors shall be fully integrated into the existing fire alarm system and shall be tested. Required fire alarm submissions, permits and scheduling of inspections shall be the responsibility of the contractor

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents