Similar Projects
Highway 287 Sound Wall Replacement
Infrastructure
Bidding
Less than $50,000 est. value
CO

UFAS/ADA Interior and Exterior Modernization
Alteration
Bidding
$225,000 est. value
Colorado Springs, CO 80916

Paired Panel Operable Wall Partitions
Post-Bid
Glenwood Springs, CO 81601

Wastewater Treatment Plant Handrail Replacement Project
Post-Bid
Craig, CO 81625

Interior Finish Work at FAA's Denver ARTCC's Childcare Facility Located in Longmont, CO
Results
$250,000 to $500,000 est. value
Longmont, CO

Waterproofing of Windows and Building Perimeter
Results
Littleton, CO 80120

Exterior Restoration and Rehabilitation
Construction
Saguache, CO 81149

Snowmass Inn Walkways and Stairs
Alteration
Bidding
Snowmass Village, CO 81611

As-Needed Painting & Drywall Services
Term Contract
Post-Bid

Y--Grand Valley Open OHV Staging Area Ph. 2
Results
$100,000 to $200,000 est. value
Grand Junction, CO

Decking For House
Post-Bid
Brighton, CO 80601

Broomfield Flooring and Drywall Replacement Project
Results
Broomfield, CO 80020

Notice 21-10-UCB000276-Site-Paver Maintenance & Repair
Post-Bid
Less than $125,000 est. value
Boulder, CO

Annual Maintenance - Resurface/ Refinishing Repairs
Term Contract
Results
Loveland, Milliken, Windsor, CO 80538

Village East Elementary School, Stucco Replacement, Cafeteria Addition and Kitchen
Post-Bid
$5,500,000 est. value
Aurora, CO 80012

Reported 03/04/2022 12:00 AM
Project Title

Plant Wall Reconstruction

Physical Address View project details and contacts
City, State (County) Castle Rock, CO   (Douglas County)
Category(s) Single Trades
Sub-Category(s) Finishes/Exterior, Finishes/Interior
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

1. Demolish all plant wall material, including plants, plant support shelving, and water lines. Existing casework to remain on the first floor and third floor casework to be removed entirely. 2. For each section of plant wall, contractor shall locate existing driplines at the top of plant wall and demolish back to location that will be within the new wall design , cap and abandon water line in place. 3. Locate existing floor drains for each wall and cap with solid plate and abandon in place. 4. Vendor responsible for proper disposal of all material associated with the demolition of the existing plant walls.

Details

Division 09 - Finishes.
Division 12 - Furnishings, Specialty Casework.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents