Similar Projects
Boiler Replacements - 147th CES
Bidding
Houston, TX 77034

Interior and Exterior Painting Services - Floor Covering Services - Refrigeration Service
Post-Bid
Waco, TX 76700

J--Chiller Boiler Systems Repairs MEDVAMC
Post-Bid
Houston, TX 77030

Retube Heating Boiler, B723
Results
Less than $25,000 est. value
San Angelo, TX 76908

Replacement of Delakalizer for Boiler Feedwater System
Results
Less than $252,100 est. value
Prairie View, TX

Odor and Corrosion Control
Post-Bid
La Marque, TX

Boiler Removal and Replacement
Results
Less than $217,800 est. value
Seguin, TX 78155

Replace Boilers and Pumps
Post-Bid
Rosharon, TX 77583

Water and Air Cooled Chiller Maintenance
Results
San Angelo, TX 76908

Replace Hydronic CHW/HHW Piping
Post-Bid
College Station, TX 77843

Annual Maintenance Services for Ozone Generators (TCWSP)
Term Contract
Results
Arlington, TX 76004

Replacement of Mechanical Systems for Offices
Post-Bid
Weatherford, TX 76086

Mechanical Services
Term Contract
Results
Magnolia, TX 77355

Steam Unit 2 Boiler Repairs
Post-Bid
Greenville, TX 75401

Chiller, Boiler Preventative Maintenance
Results
Less than $12,012 est. value
Austin, TX 78778

Reported 11/22/2019 12:00 AM
Project Title

Town Bluff Portable Water System

Physical Address View project details and contacts
City, State (County) Woodville, TX 75979   (Tyler County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

HUBZone Small Business Set Aside: Long-term contract will be a firm fixed price (FFP) contract for Potable Water Service at Town Bluff Lake. Contractor shall perform potable water system operation, maintenance, and testing services at Town Bluff Project parks. The Contractor shall perform aerobic system and back flow prevention system testing services. Services include furnishing all contract labor, equipment, vehicles, fuel, materials, supplies, supervision, quality control and non-personal services necessary to operate and maintain a potable water system at Magnolia Ridge Park and Sandy Creek Park and to provide potable water testing services at the same location; and aerobic system testing services at Campers Cove Park and back flow testing at Sandy Creek Park and, Magnolia Ridge Park.

Details

Division 22 - Plumbing, Processed Water Systems for Laboratory and Healthcare Facilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents