Similar Projects
Dick Elliot Road Reconstruction
Bidding
TX 77808

Sheep Feeding Expansion Building
Post-Bid
College Station, TX 77845

2020 Street Maintenance Asphalt Repair Contract
Post-Bid
Bryan, TX 77803

Southern Region Disaster Recovery Support BPA
Results

Overlay
Results
Less than $1,604,753 est. value
TX

Crack Seal and Seal Coat at Easterwood Airport
Post-Bid
College Station, TX 77840

Francis Drive Rehabilitation Phase 1 and 2
Results
$3,000,000 est. value
College Station, TX 77840

Base Failure Repairs and Road Reconstruction
Term Contract
Post-Bid
Less than $5,000,000 est. value
College Station, TX 77842

Coulter Drive Reconstruction and Drainage Improvements
Results
Less than $4,641,000 est. value
Bryan, TX 77803

Rellis Administration Road Project
Post-Bid
Bryan, TX 77807

Independence Avenue Sanitary Sewer Relocation
Results
Less than $550,000 est. value
Bryan, TX 77803

Midtown Reserve Subdivision Phase 106
Post-Bid
College Station, TX 77840

Asphalt Pad
Results
Less than $15,608 est. value
College Station, TX 77843

Still Creek Culvert Improvement
Post-Bid
Bryan, TX 77803

Seal Coat
Results
Less than $2,356,416 est. value
Bryan, TX 77803

Last Updated 11/22/2019 12:58 PM
Project Title

Woodville Road - Street, Drainage and Utility Improvements

Physical Address View project details and contacts
City, State (County) Bryan, TX 77803   (Brazos County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sanitary Sewers, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $4,472,225
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work: Woodville Road – Street, Drainage & Utility Improvements from Woody Lane to Old Hearne Road which will constitute the following approximate improvements: 1. 3,199 LF of street improvements which will generally consist of a 38’ wide street section with a 6’ sidewalk (south side) and 10’ sidewalk (north side), roundabout intersections at Woody Lane and Old Hearne Road intersections and underground conduit and street light concrete bases; 2. 3,316 LF of storm sewer improvements that range in pipe sizes from 42” to 18”, curb inlets, junction boxes and headwalls; 2,718 LF of water lines varying in size from 12” to 6” with appropriate fire hydrants and valves. Water improvements are along the project limits of Woodville Road and along the West Frontage Road of Earl Rudder Freeway north to its intersection with Laura Lane; 3. 6,182 LF of sanitary sewer lines varying is size from 12” to 6” with appropriate manholes. Sanitary sewer improvements are along the project limits of Woodville Road and along the West Frontage Road of Earl Rudder Freeway to a point north of its intersection with Laura Lane;

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents