Similar Projects
Munchkin Extension/Multi Trail and Woodbine Improvement - CP0528 - City of Park City
Infrastructure
Conception
$1,858,825 CJ est. value
Park City, UT 84060

Munchkin Extension/Multi Trail and Woodbine Improvement - CP0528 - City of Park City
Infrastructure
Conception
$1,858,825 CJ est. value
Park City, UT 84060

Lake Rockport Estates - Well No. 3 Rebid
Infrastructure
Bidding
$200,000 CJ est. value
Coalville, UT 84017

Sunrise and Bench Creek Ditch Piping
Infrastructure
Bidding
$590,000 CJ est. value
Kamas, UT 84036

Mountain Life Church Expansion
New Construction, Addition - 45,956 SF
Post-Bid
Park City, UT 84098

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

DFCM Construction - DNR/BOR Echo State Park Renovation Phase II
Results
Less than $6,382,000 est. value
Coalville, UT 84017

DFCM Construction - VBS Design/Build - WSU Noorda A2 Lot & Paid Parking Lot
Results
Less than $3,308,642 est. value

Harmons at the Junction
Demolition, New Construction, Infrastructure - 76,000 SF
Pending Verification
$20,000,000 CJ est. value
Park City, UT 84098

Harmons at the Junction
Demolition, New Construction, Infrastructure - 76,000 SF
Pending Verification
$20,000,000 CJ est. value
Park City, UT 84098

Iron Horse Complete Street Improvements - CP0547 - City of Park City
Infrastructure
Conception
$2,500,000 CJ est. value
Park City, UT 84060

Construction of the Snyderville Basin Water Reclamation District East Canyon Trunk Sewer Rehabilitation Project
Infrastructure
Bidding
$500,000 CJ est. value
Park City, UT 84060

Udot AVL (Approved Vendor List)- Hot Mix Asphalt
Term Contract
Post-Bid

2021 Summit County Overlay Projects
Results
$3,422,445 est. value
UT

Park City Mountain Resort Area Base Master Plan
New Construction, Infrastructure - 27,100 SF
Pending Verification
$76,300,000 CJ est. value
Park City, UT 84060

Last Updated 10/05/2022 12:12 PM
Project Title

2022 Park Improvements

Physical Address View project details and contacts
City, State (County) Francis, UT 84036   (Summit County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Park/Playground, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $600,000 [brand] Estimate
Plans Available from Civil Engineer - 10/06/22
Owner View project details and contacts
Architect View project details and contacts
Description

The project consist of installing approximately 330 of 8sewer, water services, constructing gravel parking and approximately 2000 feet of gravel trail. The CONTRACT DOCUMENTS, consisting of Request for Bids, Information for Bidders, Information Required of Bidder, Status Verification, Measurements and Payments, Certificate of Non-Collusion, Bid, Bid Bond, Agreement, Payment Bond, Performance Bond, Notice of Award, Notice to Proceed, Change Order, General Conditions, Special Provisions, Specifications, Drawings, and Addenda, may be examined at the following locations: HORROCKS ENGINEERS, 728 West 100 South, Heber, Utah 84032 DOCUMENTS REQUIRED AT BID OPENING:1. Bid forms provided. (Sections 00200, 00300, and 00355)2. Cashier or Certified check or bid bond made payable to Francis City Corporation in an amount equal to at least five percent (5%) of the total amount of the bid. Bid bonds must be underwritten by a Surety Company approved by the U.S. Department of the Treasury. (Circular 570, latest edition).DOCUMENT 00210 REQUIRED 24 HRS AFTER BID OPENING. If all required documents are not provided, the bid may be disqualified. Francis City Corporation reserves the right to accept or reject any or all proposals, or any part of any proposal, including the right to waive any informality in any part of any proposal within the best interest of Francis City. Francis City is an Equal Employment Opportunity Employer.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents