Similar Projects
Contract A - Water System Improvements Contract B - 500,000 Gallon Water Storage Tank Painting
Demolition, New Construction, Renovation, Infrastructure
Bidding
$2,000,000 CJ est. value
Rushville, IL 62681

2023 Flexible Pavement Project
Infrastructure
Bidding
$3,360,702 CJ est. value
Carol Stream, IL 60188

July 2023- June 2024 Residential Water Shut Off (B-box) Replacement
Renovation
Sub-Bidding
$600,000 CJ est. value
Park Forest, IL 60466

Water Supply Facilities Rehabilitation
Renovation
Sub-Bidding
$250,000 CJ est. value
Glendale Heights, IL 60139

Plumbing Mechanical Maintenance and Repair Services
Term Contract, Alteration
Post-Bid
Geneva, IL

Plumbing Time & Material
Term Contract
Post-Bid
Algonquin, IL

Mechanical And Plumbing Systems Renovation
Renovation
Results
Less than $4,000,000 est. value
Normal, IL 61790

Salt Storage, Generator and Sewer Connection Phase 2 (Plumbing & Electrical)
New Construction
Results
Less than $400,000 est. value
Carrollton, Hamel, Jerseyville, IL

2020 Water Main Improvements
Infrastructure
Construction
$2,706,522 CJ est. value
Heyworth, IL 61745

Water Main Lining Services
Infrastructure
Sub-Bidding
$1,600,000 CJ est. value
Berkeley, IL 60163

Zurn Plumbing Supplies
Alteration
Post-Bid
IL

CPS Phillips MEP
Alteration
Results
Chicago, IL

2023 Woodstock North High School Shower Renovations
Renovation
Sub-Bidding
$200,000 CJ est. value
Woodstock, IL 60098

Plumbing Services
Alteration
Post-Bid
Aurora, IL

Replace Campus Waterline
Infrastructure
Results
Less than $1,500,000 est. value
Carbondale, IL 62901

Last Updated 03/21/2023 05:13 PM
Project Title

East Street Water Main Improvements

Physical Address View project details and contacts
City, State (County) Sheffield, IL 61361   (Bureau County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Abandoned, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $117,575 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of March 21, 2023, the owner has decided not to award the project. At this time, the project is not expected to be rebid. For "East Street Water Main Improvements" and is further described as follows: Replacement of an existing 4" water main with approximately 460 feet of 6" PVC water main on East Street between South Street and Farnham Street. Work also includes installation of various fittings, valves, hydrants, reconnection of water services, surface restoration and miscellaneous appurtenances. Bidders are advised that this Contract will be subject to the Illinois Prevailing Wage Act. Bidders are advised that this Contract will be subject to the Illinois Steel Products Procurement Act. The successful Bidder shall provide at least 40% of all labor required for the completion of this project. The Bid shall be accompanied by a certified check or bid bond, in the amount of five percent (5%) of the gross amount of the bid and be payable to the order of the Village of Sheffield. Bids may be held by the Village of Sheffield for a period not to exceed 45 days from the date of the opening of Bids for the purpose of reviewing the Bids and investigating the qualifications of Bidders, prior to awarding of the Contract. The Owner reserves the right to accept or reject any or all Bids and to waive any informalities in the bidding. Liquidated damages shall be assessed at $500 per calendar day

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents