Similar Projects
Well Rehabilitation for Edgemont Well
Results
Provo, UT 84604

American Fork 2021 Well Rehabilitation Projects
Infrastructure
Results
$1,133,631 est. value
American Fork, UT 84003

White Hill Well Test Pumping
Infrastructure
Bidding
Eagle Mountain, UT

American Fork Hospital Well Redevelopment
Alteration
Results
$172,800 est. value
American Fork, UT 84003

Orem Well #10 And Well #1 Relocation Drilling Project
Infrastructure
Post-Bid
Orem, UT 84058

Pony Express Well-Site Release
Infrastructure
Bidding
Eagle Mountain, UT

Headquarters Well Evaluation & Rehabilitation
Term Contract
Post-Bid

Well 7 Equipping
Infrastructure
Results
Saratoga Springs, UT 84045

Boulevard Well Project
Infrastructure
Post-Bid
Pleasant Grove, UT

Alpine City Cup Filter Station Project
Results
$495,539 est. value
Alpine, UT

Drinking Water Well Rehabilitation - Well #6
Term Contract
Results
Orem, UT 84097

2550 East Canyon Road Well Rebuild 2021
Term Contract
Results
$180,000 to $200,000 est. value
Spanish Fork, UT 84660

Lehi City Sand Pit Well Development
Alteration
Post-Bid
Lehi, UT

Drinking Water Well Rehabilitation
Results
Orem, UT

DFCM Construction - Mechanical - Payson VA Nursing Home Heat Pump Replacements
Results
$352,367 est. value
Payson, UT 84651

Last Updated 02/15/2022 05:42 AM
Project Title

DFCM Construction-Pre Qualified General-UVU Campus-Wide Central Plant 3 Well Improvements

Physical Address View project details and contacts
City, State (County) Orem, UT 84058   (Utah County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $159,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of adding and upgrading the existing water metering and sand separator systems in (2) well houses. The 1st location is the 8th South Well. The 2nd location is the Track Well. The Base Bid shall include all work and materials associated with this project as outlined in the plans and specs.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents