Similar Projects
Flex Space Building
New Construction - 30,000 SF
Conception
Summerville, SC 29483

Coastal AgroBusiness
New Construction - 40,000 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Dillon, SC

Flex Space Building
New Construction - 30,000 SF
Conception
Summerville, SC 29483

Jedburg Tradeport
New Construction
Conception
$418,000,000 est. value
Summerville, SC 29483

American Spiralweld Building
New Construction - 17,221 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Columbia, SC 29209

South Atlantic Logistics Terminal - Sherwood Tract / North Point Development
New Construction - 6,000,000 SF
Conception
$200,000,000 est. value
Hardeeville, SC 29927

Scc - Trb 87/92 Warehouse Reroof
Results
$150,000 to $300,000 est. value
SC 29334

Berkeley Charleston Tradeport - Building 1
New Construction - 248,000 SF
Construction
$10,000,000 CJ est. value
Summerville, SC

Randolph Yarns Industrial Park
New Construction - 4,080,000 SF
Construction
Rock Hill, SC

New Speculative Industrial Building
New Construction - 50,000 SF
Design
Allendale, SC

Spec Building
New Construction - 44,000 SF
Design
$5,000,000 to $10,000,000 CJ est. value
West Columbia, SC 29171

Saxum Ridgeville Industrial Campus Cold Storage
New Construction
Conception
$30,000,000 est. value
Ridgeville, SC 29472

95 Inland Port Logistics Center
New Construction - 373,100 SF
Construction
$10,000,000 CJ est. value
Dillon, SC

Reported 07/01/2022 03:50 PM
Project Title

Interfor Sawmill Continuous Kiln

Physical Address View project details and contacts
City, State (County) Summerville, SC 29483   (Dorchester County)
Category(s) Industrial/Manufacturing
Sub-Category(s) Industrial Warehouse
Contracting Method Bids by Invitation.
Project Status Construction Documents, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $30,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Kiln, Silo and Tarping Station As of June 30 2022, this is in preconstruction stages. The Kiln will be built by an outside firm with trades already selected, but contact information hasn't been confirmed. Construction is expected to start July 11, 2022. The owner is seeking fire pump installers quotes, please contact the owner for additional details.

Details

Industrial Warehouse, Addition.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Windows.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Fire Protection Specialties.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Fences and Gates, Screening Devices.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents