Similar Projects
Tennant Trailhead
Renovation
Design
$400,000 est. value
WA

Joc King County
Renovation
Design
$6,000,000 est. value
WA

Engineering Services for 2021 Green to Cedar Rivers Trail Project
Infrastructure
Post-Bid
$400,000 est. value
Seattle, WA

Squire`s Landing (Park Waterfront & Natural Open Space Access Project)
Renovation
Post-Bid
Kenmore, WA 98155

2021-2022 Master Planning: Beaton Hill Park And Big Rock Park South
New Construction, Infrastructure
Results
$275,000 est. value
Sammamish, WA 98074

Des Moines Sound View Park Project
Renovation
Results
Des Moines, WA 98198

Tennant Trailhead
Renovation
Design
$1,400,000 est. value
WA

Kiwanis Park Improvements
Renovation
Post-Bid
$5,543,000 est. value
Renton, WA

Lake to Sound Trail - Segment C SeaTac - REBID
Renovation
Results
$560,206,646 est. value
Sea-Tac, SeaTac, WA

Rainbow Bend MRP
Renovation
Design
$3,000,000 est. value
WA

Athletic Field Improvements at Ingraham High School
Renovation
Post-Bid
Seattle, WA 98133

Lake City Land Banked Site Park
Demolition, Infrastructure, Alteration
Results
Seattle, WA 98125

Marymoor Gateway Trail
Renovation
Design
$900,000 est. value
WA

Skyway Park Improvements
Renovation
Results
Seattle, WA

Lake To Sound Seg C Phase Two
Renovation
Design
$1,750,000 est. value
WA

Last Updated 03/10/2022 11:35 AM
Project Title

Deyoung Park Washing and Retreatment of Wood Structures

Physical Address View project details and contacts
City, State (County) Woodinville, WA 98072   (King County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The selected Contractor must have the capability to perform a full turn-key project for the DeYoung Park Washing & Retreatment of Wood Structures. DeYoung Park underwent improvements in 2018 creating a wonderful park and community space including a central wood structure called the Treehouse. All wood structures/furnishings were finished with Penofin Verde “Natural” color per the manufacturer’s recommendations. The Scope of Work for the project is to preserve the park’s wood structures/furnishings and maintain a like-new appearance of the wood. The last treatment was completed summer of 2020. Cleaning/pressure washing, prepping, and re-staining of all wood surfaces shall be pursuant to Penofin Verde’s recommendations. The design drawings and specifications attached herein provide a reference of what the wood structures/furnishings were originally designed and finished with in 2018. Also included are some pictures of the Treehouse and boardwalk.

Details

Park/Playground, New Construction.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents