Similar Projects
Barclay Avenue Multilaning - 100380 - Hernando County
Infrastructure
Conception
$17,584,082 CJ est. value
Spring Hill, FL 34609

Barclay Avenue Multilaning - 100380 - Hernando County
Infrastructure
Conception
$17,584,082 CJ est. value
Spring Hill, FL 34609

South 19 Avenue Aparments
New Construction, Infrastructure - 13,120 SF
Design
$6,800,000 CJ est. value
Hollywood, FL 33020

South 19 Avenue Aparments
New Construction, Infrastructure - 13,120 SF
Design
$6,800,000 CJ est. value
Hollywood, FL 33020

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

District-Wide Maintenance of Continuous Deflective Separation (CDS) Units
Infrastructure
Post-Bid

Road Paving Projects - 2022
Infrastructure
Post-Bid
Brooksville, FL

Underground Utility Relocation for the Good Neighbor Trail
Infrastructure
Results
Brooksville, FL

Linden Drive Sidewalk (Spring Hill Drive to Coronado Drive) - Lap
Infrastructure
Results
$339,000 est. value
Spring Hill, FL 34611

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

Kettering Road Industrial Development
New Construction, Infrastructure - 2,400,000 SF
Pending Verification
$1,000,000,000 CJ est. value
Brooksville, FL 34602

Milkaway Farms
New Construction, Infrastructure - 50,000 SF
Pending Verification
$400,000,000 CJ est. value
Brooksville, FL 34601

Coastal Way Intersection - 105900 - County of Hernando
Infrastructure
Conception
$650,000 CJ est. value
Brooksville, FL 34613

Tommy's Car Wash / Brooksville
New Construction, Infrastructure - 5,371 SF
Bidding
$1,200,000 CJ est. value
Brooksville, FL 34613

Last Updated 02/20/2023 11:05 PM
Project Title

Add Lanes and Reconstruct - SR 50/Cortez Blvd

Physical Address View project details and contacts
City, State (County) Brooksville, FL 34601   (Hernando County)
Category(s) Heavy and Highway, Outdoor Lighting, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $15,756,084 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Counties: Hernando Road Name: SR 50/cortez Blvd - Add Lanes & Reconstruct Limits: 08002000 Project(s): 41673325201(*) Federal Aid No: N/A Total Roadway Length: 1.238 Miles Contract Days: 550 Total Bridge Length: 0.000 Miles Total Proposal Length: 1.238 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 120 Days Flex Start The Improvements under this Contract consist of concrete pavement reconstruction, widening, milling and resurfacing, overbuild, curb and gutter, drainage improvements, bike lanes, sidewalks, signing and pavement markings, signalization, structures, lighting and utilities on State Road 50/Cortez Boulevard from Cobb Road to west of Buck Hope Road in Hernando County. Prequalification Required. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 001 - SR 50/Cortez Blvd - Add Lanes and Reconstruct

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents