Similar Projects
Highway Safety and Drainage Improvements
Renovation
Design
Calverton, Wainscott, NY 11933

Design-Build Services for the Rockaway Line Long Term Flood Mitigation
Infrastructure
Bidding
$100,000,000 est. value
NY

Design-Build Services for Flood Mitigation at Twenty-Six Substations
Infrastructure
Bidding
$50,000,000 to $100,000,000 est. value
Brooklyn, Manhattan, NY

Corrugated Metal Pipe Arches and Aluminized Pipe Arches
Post-Bid
Owego, NY

Replacement of Culverts at West Main Street and Grant Street
Post-Bid
Middletown, NY 10940

Mirror Lake Drive Sidewalk, Drainage & Pavement Improvements
Results
Less than $1,600,000 est. value
Lake Placid, NY 12946

Culvert Replacement Project CR23 (Brook Road) Over Slade Creek, Saratoga Springs
Results
Ballston Spa, NY 12020

Rome Facility Trench Drain Repairs
Infrastructure
Bidding
$600,000 est. value
Rome, NY 13440

Limestone Creek and Bishop Brook Stream Bank and Riparian Buffer Improvement
Post-Bid
Fayetteville, NY

Culvert Replacement Project - Hulbert Hollow Road over a Tributary low Road over a Tributary to Michigan Creek
Results
Spencer, NY 14883

Furnish 48 Diameter Steel Reinforced Polyethylene (SRPE) Pipe and Tee Sections
Infrastructure
Bidding
Rochester, NY

Pre-Cast Catch Basin and Frame and Grate
Term Contract
Post-Bid
Schenectady, NY

Webster Avenue Drainage Improvements - Washington Avenue to Lockwood Avenue
Results
New Rochelle, NY 10801

FEMA Repairs from Flooding
Infrastructure
Bidding
$106,590 to $144,211 est. value
Orient, NY 11957

Underdrain Installation and Connection at Misc. Locations
Post-Bid
Endwell, NY

Last Updated 05/23/2022 11:27 PM
Project Title

Rappleyea Road Culvert Replacement

Physical Address View project details and contacts
City, State (County) West Kill, NY 12492   (Greene County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project proposes to replace the existing culvert with a new 42 ft. long, 95"x67" corrugated metal pipe(CMP) arch with end sections. The existing streambed will be reconstructed to accommodate the increased culvert length, and to provide stable roadway embankment slopes. Work will include clearing of vegetation around the culvert and placement of stone fill scour protection at each end of the proposed culvert. The stream will be reconstructed with a section consisting of bedding material, stone fill, and native streambed material. Stone check dams will be installed both upstream and downstream of the culvert to reduce flow velocity. During construction traffic will use the temporary on-site detour installed to the south of the existing culvert.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents