Similar Projects
Rapid Central Station Canopy Structure Painting
Renovation
Bidding
Grand Rapids, MI 49503

Rockford Public Schools - ERMS and ERMS Finish Upgrades
Bidding
Rockford, MI 49341

Township Hall Painting Services
Post-Bid
Brighton, MI 48114

Interior Housing Painting
Post-Bid
Sault Sainte Marie, MI 49783

Paint Exterior - Building 1425
Results
$25,000 to $100,000 est. value
Harrison Township, MI 48045

USCG Housing Interior Painting
Results
Sault Sainte Marie, MI 497832021

WTP Repainting Project
Bidding
Gladstone, MI

Maintenance/Transportation Building
Post-Bid
Midland, MI

Seaway Drive Railroad Bridge Painting
Term Contract
Results
Muskegon, MI

Painting Services
Post-Bid
Ann Arbor, MI 48104

Repainting of CCTA Shop Floors
Results
Kalamazoo, MI

7,500 Gallon Hydropneumatic Tank Exterior, Piping and Wet Interior Repaint
Post-Bid
MI

Painting Services
Term Contract
Results
Wayne, MI 48184

Fire Station 4 Apparatus Bay Painting
Post-Bid
Clinton Township, MI

Water Tank Painting
Results
Grandville, MI

Reported 01/02/2020 09:03 AM
Project Title

Summit Aquatic Center Lazy River Coating Replacement

Physical Address View project details and contacts
City, State (County) Canton, MI   (Wayne County)
Category(s) Single Trades
Sub-Category(s) Painting
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $25,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The pool water will be drained and filled by Canton. Contractor truck access shall be to the south door to the aquatic center. New material will need to be pumped from the access door to the lazy river. Demolition shall include, but not limited to, the following: 1. Removal of stair tiles. 2. Selective removal of existing Marcite materials around tile that is to remain or pool features such as; lights, inlets, returns and etc. in preparation for new materials. 3. Removal of existing Marcite surface of at least 10% in preparation of new material. Any loose, hollow or delineated material shall be removed at an additional scope and cost to be determined by owner and Contractor at time of construction. Installation shall include, but not limited to, the following: 1. 100 lineal feet of porcelain pool rated stair tile. Contractor recommended product to be provided as part of proposal. Tile to be installed per manufacturer’s recommendations. 2. After demolition and prior to application of new Marcite the existing surface shall be acid washed and all dirt and debris removed. The surface shall be prepared in accordance with material installation standards. Contractor to provide recommended material application methods as part of proposal. 3. New Marcite shall be installed on the floor and walls of the lazy river and slide plunge pool at a minimum of 3/8th of an inch. Contractor to provide recommended material specifications as part of proposal.

Details

Division 09 - Finishes, Painting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents